update dev-claude-plugin/0056/SESSION-0056.0-TRANSCRIPT-2026-06-10T09-25--INPROGRESS.md

This commit is contained in:
2026-06-10 20:25:48 -07:00
parent 4654d48320
commit 6c83929862
@@ -55,8 +55,20 @@ Process the open plugin-feedback queue (6 untriaged issues, including just-filed
- **#93 → accepted.** `type/feature`, design-gated: required design reference
for UX slices (*-content/ui/designs) + backfill gesture. Next:
/wgl-brainstorming anchored on #93.
- Mid-pass arrivals (untriaged, from concurrent sessions): #95, #96, #99, #106
several overlap the #93 Claude-Design theme.
- Mid-pass arrivals processed too (operator opted to continue):
- **#95 → accepted.** `type/feature`, design-gated — issue-linkage complement
of #93; recommend ONE brainstorming session covering #93+#95, consistent
with engineering#32.
- **#96 → accepted.** `type/feature`, design-gated — sd/* + uxd/* readiness
labels + a deterministic `wgl-next` verb; coordinate with #93/#95, the
#77#79 taxonomy work, and engineering#32.
- **#99 → accepted.** `type/epic` — Gitea-as-workflow-engine (spawn staged
pre-implementation task issues on triage approval). Next: /wgl-capture
decomposition, coordinated with epic #89.
- **#106 → done (0.48.0, PR #108 merged).** `type/task` — one-line Claude
Design vs Code rubric pointer (§5.1) in wgl-brainstorming Step 9.
- Queue fully drained: 0 untriaged. Source main at 0.48.0; running pin 0.42.0
(re-install due at finalize via update-plugin.sh).
## Deferred decisions