diff --git a/dev-claude-plugin/0056/SESSION-0056.0-TRANSCRIPT-2026-06-10T09-25--INPROGRESS.md b/dev-claude-plugin/0056/SESSION-0056.0-TRANSCRIPT-2026-06-10T09-25--INPROGRESS.md index ae27b9a..c0b0cd5 100644 --- a/dev-claude-plugin/0056/SESSION-0056.0-TRANSCRIPT-2026-06-10T09-25--INPROGRESS.md +++ b/dev-claude-plugin/0056/SESSION-0056.0-TRANSCRIPT-2026-06-10T09-25--INPROGRESS.md @@ -55,8 +55,20 @@ Process the open plugin-feedback queue (6 untriaged issues, including just-filed - **#93 → accepted.** `type/feature`, design-gated: required design reference for UX slices (*-content/ui/designs) + backfill gesture. Next: /wgl-brainstorming anchored on #93. -- Mid-pass arrivals (untriaged, from concurrent sessions): #95, #96, #99, #106 — - several overlap the #93 Claude-Design theme. +- Mid-pass arrivals processed too (operator opted to continue): + - **#95 → accepted.** `type/feature`, design-gated — issue-linkage complement + of #93; recommend ONE brainstorming session covering #93+#95, consistent + with engineering#32. + - **#96 → accepted.** `type/feature`, design-gated — sd/* + uxd/* readiness + labels + a deterministic `wgl-next` verb; coordinate with #93/#95, the + #77–#79 taxonomy work, and engineering#32. + - **#99 → accepted.** `type/epic` — Gitea-as-workflow-engine (spawn staged + pre-implementation task issues on triage approval). Next: /wgl-capture + decomposition, coordinated with epic #89. + - **#106 → done (0.48.0, PR #108 merged).** `type/task` — one-line Claude + Design vs Code rubric pointer (§5.1) in wgl-brainstorming Step 9. +- Queue fully drained: 0 untriaged. Source main at 0.48.0; running pin 0.42.0 + (re-install due at finalize via update-plugin.sh). ## Deferred decisions