update dev-claude-plugin/0056/SESSION-0056.0-TRANSCRIPT-2026-06-10T09-25--INPROGRESS.md
This commit is contained in:
@@ -55,8 +55,20 @@ Process the open plugin-feedback queue (6 untriaged issues, including just-filed
|
||||
- **#93 → accepted.** `type/feature`, design-gated: required design reference
|
||||
for UX slices (*-content/ui/designs) + backfill gesture. Next:
|
||||
/wgl-brainstorming anchored on #93.
|
||||
- Mid-pass arrivals (untriaged, from concurrent sessions): #95, #96, #99, #106 —
|
||||
several overlap the #93 Claude-Design theme.
|
||||
- Mid-pass arrivals processed too (operator opted to continue):
|
||||
- **#95 → accepted.** `type/feature`, design-gated — issue-linkage complement
|
||||
of #93; recommend ONE brainstorming session covering #93+#95, consistent
|
||||
with engineering#32.
|
||||
- **#96 → accepted.** `type/feature`, design-gated — sd/* + uxd/* readiness
|
||||
labels + a deterministic `wgl-next` verb; coordinate with #93/#95, the
|
||||
#77–#79 taxonomy work, and engineering#32.
|
||||
- **#99 → accepted.** `type/epic` — Gitea-as-workflow-engine (spawn staged
|
||||
pre-implementation task issues on triage approval). Next: /wgl-capture
|
||||
decomposition, coordinated with epic #89.
|
||||
- **#106 → done (0.48.0, PR #108 merged).** `type/task` — one-line Claude
|
||||
Design vs Code rubric pointer (§5.1) in wgl-brainstorming Step 9.
|
||||
- Queue fully drained: 0 untriaged. Source main at 0.48.0; running pin 0.42.0
|
||||
(re-install due at finalize via update-plugin.sh).
|
||||
|
||||
## Deferred decisions
|
||||
|
||||
|
||||
Reference in New Issue
Block a user