101 lines
5.2 KiB
Markdown
101 lines
5.2 KiB
Markdown
# Session 0077.0 — Transcript
|
||
|
||
> App: dev-claude-plugin
|
||
> Start: 2026-06-22T08-23 (PST)
|
||
> End: 2026-06-22T08-37 (PST)
|
||
> Type: planning-and-executing
|
||
> Posture: yolo
|
||
> Claude-Session: f4514902-147b-4807-bd13-c6fc2de3ca3f
|
||
> Anchor: design `engineering/docs/sdl-pipeline-refactor-brief.md` (R2a) · Feature #126 · Epic #125
|
||
> Status: **FINALIZED**
|
||
|
||
## Launch prompt
|
||
|
||
`/goal next → F2 (wgl-brainstorming --lenses brd|prd)` — resume the stored next
|
||
goal: **F2** of the staged-gate SDLC refactor Epic.
|
||
|
||
## Plan
|
||
|
||
**Goal (F2 / #126):** extend `wgl-brainstorming` so each design-track lens is an
|
||
individually-gated, accreting stage selected by `--lenses brd|prd`.
|
||
|
||
Tasks:
|
||
1. **`lenses-for-type.sh`** (new, `wgl-session-common/scripts/`) — deterministic
|
||
§4.2 mapping issue-type → applicable lenses (feature → REQUIRED brd prd; leaf
|
||
story/task/bug → SKIPPABLE; epic → NONE), `--type` (pure) + `--repo/--issue`
|
||
(resolved) paths. Offline test `test-lenses-for-type.sh`.
|
||
2. **`wgl-brainstorming/SKILL.md`** — add the `--lenses brd|prd` parameter; BRD
|
||
run authors the business lens, PRD run accretes the product lens (+ design-vs-
|
||
code decision) into the SAME SPEC, each ending at a terminal review gate; lens
|
||
applicability via the new script; cite F1's reconciled handbook; keep
|
||
no-`--lenses` whole-spec behavior as the bridge until F3/F5.
|
||
3. **Version bump** 0.56.0 → 0.57.0.
|
||
4. **Lint** + branch → PR → merge.
|
||
|
||
## Session arc
|
||
|
||
1. **Routed** the `/goal next → F2` opener through the session gate → a
|
||
planning-and-executing (coding) session; invoked `wgl-planning-and-executing`.
|
||
2. **Claimed session 0077** (peek showed 6 stale `--INPROGRESS` placeholders,
|
||
0035/0048/0058/0065/0068/0068/0076 — 9–13 days old, none live; already isolated
|
||
in worktree `elastic-mccarthy-069d00`, so §5.4 satisfied).
|
||
3. **Oriented** on F2 from the locked brief (`engineering/docs/sdl-pipeline-refactor-brief.md`,
|
||
design-track steps 1–2) and issue **#126** (full acceptance criteria fetched).
|
||
4. **Eligibility gate (Step 8.5):** #126 is `type/feature` → INELIGIBLE as a bare
|
||
feature (R3); ELIGIBLE anchored on the locked brief (R2a). Anchored on the
|
||
brief — rationale logged in Deferred decisions.
|
||
5. **Read F1's reconciled handbook** (§3.3 accretion + the lens→section table;
|
||
§4.3 R1–R3 lens-by-type) so the skill prose CITES rather than restates (§4.1).
|
||
6. **Built `lenses-for-type.sh` TDD:** wrote `test-lenses-for-type.sh` (red, 0/14)
|
||
→ implemented the script → green (14/14). Modeled on `check-issue-eligibility.sh`
|
||
/ `test-issue-eligibility.sh` (stub gitea-api via fake `CLAUDE_PLUGIN_ROOT`).
|
||
7. **Edited `wgl-brainstorming/SKILL.md`:** new `## The --lenses brd|prd parameter`
|
||
section (param, accretion-into-one-SPEC, terminal gate / no hand-off,
|
||
type-applicability via the new script, Engineering lens = F3's wgl-tech-design,
|
||
transitional no-`--lenses` default); Step 8.5 +point 5 (lens-applicability
|
||
check); Step 9 points 3–4 made lens-scoped + terminal. Caught + fixed an
|
||
inline-CLI-comment violation in a command block (`no-inline-cli-comments`).
|
||
8. **Version bump** 0.56.0 → 0.57.0.
|
||
9. **Verified:** new test 14/14; full `wgl-session-common` test sweep green (no
|
||
regressions); `scripts/lint.sh --check-bump` clean (shellcheck skipped — not
|
||
installed locally).
|
||
10. **Shipped:** committed (29326e3), pushed, opened PR **#130**, merged to main
|
||
(bfa8efe), **#126 closed** via `Fixes #126`.
|
||
11. **Finalize:** made 0.57.0 live (`update-plugin.sh`, 0.56.0→0.57.0); updated
|
||
memory (project + sdlc-refactor + index); tore down the worktree; published
|
||
this transcript.
|
||
|
||
## Pipeline status (§9)
|
||
|
||
`dev-claude-plugin` is a Claude Code plugin (skills + docs + hooks), **not** a
|
||
flotilla-deployed UI app — it has no localhost/PPE/prod pipeline stage. Its
|
||
"ship" equivalent is the version bump made live for the next session via
|
||
`update-plugin.sh` (done, 0.57.0). No E2E/PPE stage to run.
|
||
|
||
## Deferred decisions
|
||
|
||
- **Anchor = the locked Epic brief, not a per-Feature Solution Design.** #126 is
|
||
`type/feature`, which R3 refuses for direct planning. Anchored instead on
|
||
`engineering/docs/sdl-pipeline-refactor-brief.md` (ELIGIBLE R2a) because: the
|
||
brief is the locked source-of-record carrying F2's full business/product/eng
|
||
intent; this is a **bootstrap Epic** building the very per-Feature staged-design
|
||
process that does not yet exist (it cannot be required to build itself); F1
|
||
shipped the same way. R3's purpose (a contract to judge the code against) is met
|
||
by the brief + #126's acceptance criteria. Low-confidence-but-deliberate; would
|
||
have liked a nod but proceeded under yolo.
|
||
|
||
## Next session
|
||
|
||
**F3 — wgl-tech-design** (#127, Epic #125): a new gate-lifter session type
|
||
authoring the SPEC **Engineering lens** (architecture/contract only — no task
|
||
breakdown, which stays the plan's Tasks), accreting after brd/prd into the same
|
||
SPEC, ending at its own gate → SPEC complete. Reuse F2's `lenses-for-type.sh`.
|
||
Anchor on the locked brief (R2a; #127 is `type/feature`, bare-ineligible).
|
||
|
||
```
|
||
/goal F3 — wgl-tech-design (#127): new gate-lifter authoring the SPEC Engineering lens, accreting after brd/prd
|
||
```
|
||
|
||
⚠️ Still outstanding (from session 0075): rotate the leaked
|
||
`wgl-gitea-issues-readwrite-token` Keychain secret (§6.3).
|