108 lines
6.0 KiB
Markdown
108 lines
6.0 KiB
Markdown
# Session 0028.0 — Transcript
|
||
|
||
> App: dev-claude-plugin
|
||
> Start: 2026-06-07T15-59 (PST)
|
||
> End: 2026-06-07T16-28 (PST)
|
||
> Type: executing-plans
|
||
> Status: **FINALIZED**
|
||
|
||
## Launch prompt
|
||
|
||
```
|
||
Implement the two-session-model + spec/plan content-repo collections design: rebase feat/two-session-artifact-collections onto origin/main, then writing-plans -> execute -> ship (>=0.21.0)
|
||
```
|
||
|
||
## Outcome
|
||
|
||
**Shipped 0.22.0** — the two-session model + spec/plan content-repo collections
|
||
(effort B's deferred artifact-reconciliation half, designed in session 0025).
|
||
Merged via **plugin PR #22** (merge `cabcf44`) + coordinated **engineering PR #18**
|
||
(merge `1b01d7d`, app.schema 1.2). Both live on their respective `origin/main`.
|
||
|
||
## Pre-state
|
||
|
||
- On `main`, clean, synced with `origin/main` at 0.21.0 (session 0027's Patchwatch
|
||
Phase 2B).
|
||
- The feature branch `feat/two-session-artifact-collections` existed (local +
|
||
origin), cut from an **old main** (merge-base 0.18.0, `4fe6998`). Its cumulative
|
||
diff vs current origin/main looked alarming (deleting `wgl-remediate`, the
|
||
patchwatch/feedback hooks, etc.) — purely because its base predated those
|
||
merges. Its real content was a single design doc (+223 lines).
|
||
- Two stale `--INPROGRESS` placeholders in the history (0020, 0021), neither
|
||
flagged ENDED-UNFINALIZED, both predating session 0027 → orphaned, not live.
|
||
|
||
## Arc
|
||
|
||
1. **Session gate / claim.** Classified the explicit `/goal` as **executing-plans**
|
||
(implement a design → ship). Ran `wgl-executing-plans`: peeked (saw the two
|
||
stale placeholders, warned + proceeded per autonomous default), claimed **0028**.
|
||
Seeded the `## Plan` block.
|
||
2. **Rebase.** `git rebase feat/two-session-artifact-collections` onto origin/main —
|
||
clean (only the design doc). Confirmed the merged 0.19–0.21 features were present
|
||
and the branch's delta was just the design doc. (Force-push to sync the rebased
|
||
branch was **denied** by a harness guardrail — held all pushes for ship time.)
|
||
3. **writing-plans.** Read every touchpoint (`resolve-app.py`, `submit-spec.sh`,
|
||
`claim-session-id.sh`, `session-gate.md`, `wgl-session-finalize`, the SKILLs,
|
||
manifests, the central `app.schema.json`), then wrote a 12-task implementation
|
||
plan (`docs/superpowers/plans/2026-06-07-two-session-model-and-artifact-collections.md`)
|
||
via `superpowers:writing-plans`. Self-reviewed against the design — full coverage,
|
||
no placeholders, consistent `CONTENT_*` types.
|
||
4. **execute** (`superpowers:executing-plans`, inline, one commit per task):
|
||
- **T1** `resolve-app.py` — `content` role → `CONTENT_*` exports (6 keys,
|
||
empty on this app). **T2** `submit-spec.sh` → `<content>/specs/` (+ rename
|
||
`--spec-rfc-remote`→`--content-remote`). **T3** new `submit-plan.sh` →
|
||
`<content>/plans/` (archive, no status). **T4** `claim-session-id.sh` default
|
||
`planning-and-executing` + legacy tokens. **T5** `git mv` `wgl-executing-plans`
|
||
→ `wgl-planning-and-executing` (+ write-the-plan framing). **T6** fold
|
||
`wgl-writing-plans` into `wgl-brainstorming` (spec reviewed, BDDs input); remove
|
||
the retired skill. **T7** gate 5→4 type. **T8** finalize dual-token dispatch +
|
||
content routing. **T9** full cross-ref sweep. **T10** version 0.22.0 + manifest.
|
||
**T11** central schema `content` descriptor (1.2) on a branch in the
|
||
`engineering` repo. **T12** verification sweep.
|
||
- Each task verified deterministically (resolver `--json`, script `bash -n` +
|
||
`--help` + graceful no-content dry-run, `git grep` invariants, schema sample
|
||
validation incl. a negative additionalProperties check).
|
||
5. **ship.** Force-push denied → pushed to a fresh branch ref
|
||
`feat/two-session-model-content-collections` (a new ref is never a force).
|
||
Pushed the engineering schema branch. Opened both PRs via the Gitea API
|
||
(`gitea-api.sh`), confirmed mergeable, **merged both** (merge-commit style,
|
||
delete-branch-after-merge). Fast-forwarded local plugin `main`; confirmed both
|
||
`origin/main`s carry the change. Restored the engineering shared checkout to the
|
||
concurrent session's branch it was on.
|
||
|
||
## Cut state
|
||
|
||
- Plugin `main` == `origin/main` at **0.22.0** (PR #22 merged); no open PRs; clean tree.
|
||
- Engineering `origin/main` carries app.schema **1.2** (PR #18 merged); working
|
||
checkout restored to `docs/solution-design-pain-points-business-framing`.
|
||
- Two intentional landing-spot pointers to the retired `wgl-writing-plans` name
|
||
remain (README + brainstorming) — by design.
|
||
|
||
## Deferred decisions
|
||
|
||
1. **Shipped 0.22.0, not the design's stated 0.19.0** — origin/main had advanced to
|
||
0.21.0; took the next free minor per the design's own "rebase if another minor
|
||
lands first" note. Low risk.
|
||
2. **Did not adopt/finalize the two stale `--INPROGRESS` placeholders** (0020, 0021)
|
||
— not ENDED-UNFINALIZED, predate session 0027; orphaned, not live. Warned +
|
||
proceeded. They remain open on the history; worth a cleanup pass.
|
||
3. **Pushed to a new branch ref** instead of force-pushing the rebased branch —
|
||
`git push --force-with-lease` was denied by a harness guardrail. The old remote
|
||
`feat/two-session-artifact-collections` still carries the pre-rebase 2 design
|
||
commits (now stale); the PR merged from the new ref. Functionally identical.
|
||
4. **Left `dev-claude-plugin`'s own `app.json` unmigrated** (still `spec-rfc`, not
|
||
`content`) — explicit design out-of-scope; the submit scripts no-op gracefully.
|
||
Recorded as the plugin-internal Next-/goal follow-up.
|
||
|
||
## Next session
|
||
|
||
Stored `Next /goal:` is unchanged — **Patchwatch Phase 2, sub-project A (Capture),
|
||
in flotilla-core** (this session was an explicit-goal interrupt and did not consume
|
||
the stored goal). Plugin-internal alternatives recorded in memory: the per-app
|
||
`app.json` content-repo migration (the fresh follow-up from this session), SP2
|
||
`/goal feedback` orchestrator, worktrees effort A impl, and the perennial operator
|
||
re-install to make 0.22.0 live.
|
||
|
||
No §9 deployment pipeline stage ran — this is a plugin source change with no
|
||
deployable UI app (meta/docs/scripts only).
|