Files
session-history/dev-claude-plugin/0078/SESSION-0078.0-TRANSCRIPT-2026-06-22T08-42--2026-06-22T08-54.md
T

66 lines
6.7 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Session 0078.0 — Transcript
> App: dev-claude-plugin
> Start: 2026-06-22T08-42 (PST)
> End: 2026-06-22T08-54 (PST)
> Type: planning-and-executing
> Posture: yolo
> Claude-Session: 037a56a3-91e5-4e08-8023-095c65246353
> Status: **FINALIZED**
## Launch prompt
```
/goal F3 — wgl-tech-design (#127): new gate-lifter skill authoring the SPEC Engineering lens, accreting after brd/prd.
Part of the staged-gate SDLC refactor (Epic #125). F1 (handbook accretion) and F2 (wgl-brainstorming --lenses brd|prd) shipped. F3 adds the Engineering-lens gate-lifter that accretes the engineering lens into the SAME SPEC after the business/product lenses.
```
## Plan
> Anchor: design `engineering/docs/sdl-pipeline-refactor-brief.md` (R2a, locked Solution Design) — Feature **#127** (parent Epic **#125**). Eligibility: ELIGIBLE (R2a).
> Goal: F3 of the staged-gate SDLC refactor — build **`wgl-tech-design`**, a new gate-lifter session type that authors the SPEC **Engineering lens** (Technical Design §6) by accretion into the *same* SPEC the brd/prd lenses created, at the architecture/contract altitude (**NO task breakdown** — that's F4), ending at a terminal review gate.
**Scope boundary (per #127):**
- **In F3:** the `wgl-tech-design` skill; make the type claimable + posture-stamped (`claim-session-id.sh` type→posture single-home → `tech-design` = careful) + its test; thin-SPEC path for leaf issues; cites reconciled handbook (F1), reuses existing deterministic tools.
- **Deferred to F5 (#129):** registering `tech-design` in the session-gate hook type table + the wgl-session-finalize dispatch table + stale-ref sweep. (Finalize Step-0 fallback covers the transitional gap.)
## Pre-state
- Branch `claude/pedantic-carson-35d379` (harness-provided worktree) tracking a clean, pushed `origin/main` at `bfa8efe` (F2 / v0.57.0 merge).
- Plugin pin loaded by this session: **0.57.0**.
- Six stale `--INPROGRESS` placeholders (00350076, 9+ days old) in the app's session-history — orphaned crashes, none flagged ENDED-UNFINALIZED, none live. No live concurrent same-app session.
## Arc
1. **Classified + opened the session.** Session gate → planning-and-executing (build a skill, plan→code). Invoked `wgl-planning-and-executing`.
2. **Claimed session 0078** (peek → no live concurrency → atomic claim). Stamped `Type: planning-and-executing`, `Posture: yolo`. Local placeholder in `~/.wgl`.
3. **Verified baseline** clean/pushed; CLAUDE.md already imports `@~/.claude/wiggleverse.md`.
4. **Studied the F2 pattern + the locked brief.** Read `engineering/docs/sdl-pipeline-refactor-brief.md` (design-track step 4 — wgl-tech-design authors the engineering lens, no task breakdown; two altitudes stay distinct), the shipped `wgl-brainstorming/SKILL.md` (`--lenses brd|prd` accretion model), `lenses-for-type.sh`, and issue **#127** (in-scope vs F5 non-goals). Confirmed via `solution-design/GUIDE.md` that the **engineering lens = Technical Design §6**, and completes the SPEC.
5. **Eligibility (Step 8.5):** `check-issue-eligibility.sh --design <brief> --for implementation-plan` → ELIGIBLE (R2a, locked Solution Design). #127 itself is a bare `type/feature` (R3-ineligible) — anchored on the brief instead.
6. **Built F3** (4 tasks):
- `claim-session-id.sh`: added `tech-design` to `--type` validation + error msg + the type→posture single-home (→ **careful**, design INV-1). Header doc updated.
- `test-posture-stamp.sh`: added `tech-design → careful` assertion. → **11/11 pass**.
- `skills/wgl-tech-design/SKILL.md`: the new gate-lifter — front-half reuse (claim/baseline/memory Steps 17), engineering-lens accretion into the existing SPEC, **thin-SPEC path** for a leaf that skipped brd/prd, careful-by-construction + terminal gate, the load-bearing **architecture/contract-only (no task breakdown)** boundary, eligibility reuse (`--for solution-design` R1; `lenses-for-type.sh` R1R3), finalize participation (spec addendum) + a bootstrap note on F5 wiring. Cites handbook §3.3/§4.3 + GUIDE rather than restating (§4.1).
- `plugin.json`: 0.57.0 → **0.58.0**.
7. **Verified:** `test-posture-stamp.sh` 11/11 · `test-session-id-ownership.sh` 20/20 · `test-lenses-for-type.sh` 14/14 · `test-issue-eligibility.sh` 14/14 · `lint.sh --check-bump` clean (shellcheck skipped — not installed; later confirmed `0.57.0 → 0.58.0 with skills changes`).
8. **Shipped:** committed `869ce50`, pushed, opened **PR #131** (Gitea API; the issues token 403'd on PR scope → used the default per-host `wgl-gitea-token-git.wiggleverse.org`), merged to `main` (`72a2576`). **#127 closed** (PR body `Closes #127`).
9. **Finalize:** clean tree, no open PRs. No separate writing-plans artifact (plan was inline) → nothing to `submit-plan.sh`. Meta/plugin change → no PPE pipeline stage. **Cache-lag:** loaded 0.57.0 < shipped 0.58.0 → ran `update-plugin.sh`**0.57.0 → 0.58.0 made live** (applies to new sessions; restart/`/clear` to load). Memory updated; transcript published.
## Cut state
- `origin/main` @ `72a2576` — F3 merged, **v0.58.0** shipped and made live.
- `wgl-tech-design` skill exists and is invocable (lifts the gate when invoked directly). `tech-design` is a claimable session type stamping careful posture.
- **#127 closed.** Epic #125: F1✓ F2✓ F3✓ — **F4 (#128) next**, then F5 (#129).
- Worktree `pedantic-carson-35d379` left for harness cleanup (branch merged/clean).
## Deferred decisions
- **F3/F5 boundary on finalize dispatch.** #127's scope lists "finalize participation" as in-scope but "finalize dispatch table" as an F5 non-goal — a genuine tension. **Resolved:** F3 makes the type claimable + posture-stamped and the skill *describes* its finalize participation; the actual `case` registration in `wgl-session-finalize` (and the session-gate classifier table) is left to F5. Until then, finalize's Step-0 fallback routes a `tech-design` SPEC to the spec addendum. Low-confidence call logged here for review; the gap is benign during the bootstrap (the new types aren't yet driven by the pipeline gate).
- **Engineering lens NOT added to `lenses-for-type.sh`.** That script is deliberately the brainstorming `{brd, prd}` pair; the engineering lens applicability is handled by reusing `check-issue-eligibility.sh --for solution-design` (R1) + reading the brd/prd verdict for the feature-vs-leaf path. No new deterministic tool invented (§4.2).
## Next-session prompt
```
/goal F4 — split wgl-planning-and-executing into wgl-writing-plans + wgl-executing-plans (#128, Epic #125): one plan = one execution; the SPEC's native Task→Step structure IS the decomposition (no per-slice loop); thin wrappers at native superpowers grain. Anchor on the locked brief (R2a). Then F5 (#129) wires the gate/finalize tables for the F3+F4 types + stale-ref sweep.
```