109 lines
5.8 KiB
Markdown
109 lines
5.8 KiB
Markdown
# Session 0046.0 — Transcript
|
||
|
||
> App: dev-claude-plugin
|
||
> Start: 2026-06-10T00-37 (PST)
|
||
> End: 2026-06-10T00-53 (PST)
|
||
> Type: planning-and-executing
|
||
> Status: **FINALIZED**
|
||
|
||
## Launch prompt
|
||
|
||
```
|
||
Fix three Gitea issues in one session, then close them after verification:
|
||
- #58 Park deferred goals as Gitea issues, not the single memory slot (finalize seam)
|
||
- #59 Escalate the feedback-notice on untriaged-count threshold / triage cadence
|
||
- #27 Solution Designs displayed and reviewed one section at a time (brainstorming spec authoring)
|
||
```
|
||
|
||
## Plan
|
||
|
||
Fix three plugin-tracker issues, one branch/PR, isolated worktree off `origin/main`
|
||
(0.29.0) because sessions 0035/0040–0045 were concurrently in flight.
|
||
|
||
- **#59** — `hooks/feedback-notice`: escalate when untriaged ≥ configurable threshold
|
||
(default 8) or triage stalled; distinct message; fail-open preserved.
|
||
- **#58** — finalize seam: `finalize-core.md` Step 5b offers to park deferred goals as
|
||
typed issues via `capture-issues.sh`, keeping `Next /goal:` for the immediate next step;
|
||
memory = pointer + context, not the queue.
|
||
- **#27** — `wgl-brainstorming` Step 9: author + review the Solution Design one section at
|
||
a time (draft → rendered URL → discuss → approve → advance); never YOLO a whole spec.
|
||
|
||
## Pre-state
|
||
|
||
- `origin/main` at `e4441f6` (0.30.0's predecessor 0.29.0); advanced to `795ebe1`
|
||
(a concurrent brainstorming session's spec submit) before merge — no conflict.
|
||
- Heavy concurrency: sessions 0035, 0040–0045 all `--INPROGRESS` at claim time. The
|
||
shared checkout sat on `fix/capture-finalize-skip-memory` (another session's branch).
|
||
- The three target issues were filed by the 0039 retrospective (#58/#59) and earlier
|
||
(#27, P0 `triaged:accepted`).
|
||
|
||
## Session arc
|
||
|
||
1. **Gate + claim.** Classified the 3-issue fix as planning-and-executing; ran
|
||
`wgl-planning-and-executing`; claimed session **0046** (peek showed 0035/0040–0045
|
||
in flight → autonomous default: warn + proceed).
|
||
2. **Isolated.** Created worktree `.claude/worktrees/session-0046` off `origin/main`
|
||
(§5.4 — the shared checkout was another session's). Read all source for the three
|
||
issues.
|
||
3. **#59 — feedback-notice escalation.** Added `WGL_FEEDBACK_UNTRIAGED_THRESHOLD`
|
||
(default 8) + a cheap no-state-file cadence proxy `WGL_FEEDBACK_TRIAGE_MAX_AGE_DAYS`
|
||
(default 14, oldest-untriaged age from `created_at`). Escalated `🚨 TRIAGE OVERDUE`
|
||
message; bad-override→default sanitizer; fail-open preserved. **Verified:** live
|
||
(24 untriaged → escalates), routine path (high threshold), invalid-env fallback,
|
||
non-plugin silence, and synthetic cadence (30d issue → overdue; triaged excluded).
|
||
4. **#58 — parked-goals-as-issues.** Added `finalize-core.md` **Step 5b** (park deferred
|
||
threads as typed issues via `capture-issues.sh`, resume context in body, right tracker
|
||
via `--repo`/`--host`, operator-visible) + a Step 5 memory-role note + a Step 6 tie-in.
|
||
Backfill check found the long-"PARKED" Patchwatch rfc-app thread is now
|
||
`status:remediating` on #36–#40 (active, not parked — stale memory, exactly #58's
|
||
point) and the plugin-side parked threads already filed as #55–#62 → no fabricated
|
||
backfill issue.
|
||
5. **#27 — section-by-section spec authoring.** Added `wgl-brainstorming` **Step 9**
|
||
(draft a section → commit/push to session branch → rendered Gitea `src/branch/…` URL →
|
||
discuss/iterate → approve → advance), explicitly overriding the autonomous sprint for
|
||
spec authoring; adjusted the "submitted at finalize" section for consistency.
|
||
6. **Ship.** Bumped `plugin.json` 0.29.0→**0.30.0**, updated the CLAUDE.md
|
||
feedback-notice description, committed (`34a6e9c`), pushed, opened **PR #65**, merged
|
||
(`29c358c`). Closed **#58/#59/#27** with resolution comments + `resolution:done`
|
||
(Gitea had auto-closed only #59 from the PR keyword).
|
||
7. **Dogfood Step 5b.** Filed **#66** (P3 task) — mention section-by-section authoring in
|
||
the canonical engineering `solution-design/GUIDE.md` — this session's one parked thread,
|
||
filed via the new path instead of buried in memory.
|
||
|
||
## Cut state
|
||
|
||
- **Shipped:** plugin **0.30.0** on `origin/main` (`29c358c`). PR #65 merged.
|
||
- **Issues:** #58, #59, #27 closed `resolution:done`; #66 filed (follow-up).
|
||
- Worktree clean, branch merged; transcript published. **Re-install needed** to make
|
||
0.30.0 live (the running session still loads the 0.28.1 cache).
|
||
|
||
## Deferred decisions
|
||
|
||
- **#58 backfill — did NOT file a new "Patchwatch remediation depth" parked-goal issue.**
|
||
On checking trackers: rfc-app Patchwatch #36–#40 are `status:remediating` (active, not
|
||
parked — the memory "PARKED" note was stale, the exact failure #58 fixes); plugin-side
|
||
parked threads already filed as #55–#62. Filing another would add stale noise.
|
||
- **#27 scope — authoring protocol went in `wgl-brainstorming`, not the canonical
|
||
`engineering/solution-design/GUIDE.md`.** The GUIDE owns document shape; the interactive
|
||
review loop is session mechanics the skill owns. The engineering repo was also mid-work
|
||
on a feature branch (collision risk). Parked the GUIDE follow-up as **#66** (dogfooding
|
||
Step 5b).
|
||
|
||
## Operator plate
|
||
|
||
- **Re-install 0.30.0** to make the new hook behavior / finalize Step 5b / brainstorming
|
||
Step 9 live: `claude plugin marketplace update wiggleverse-dev-claude-plugin` then
|
||
`claude plugin update wiggleverse-dev-claude-plugin@<marketplace>`, then restart/`/clear`.
|
||
- **High-leverage next move:** `/goal feedback` — the ~25-untriaged pile is now loudly
|
||
nudged by the very escalation shipped this session (the #59 catch-up triage pass).
|
||
|
||
## Next-session prompt
|
||
|
||
```
|
||
/goal feedback
|
||
```
|
||
|
||
(Triage the ~25 untriaged plugin-feedback issues — the catch-up pass from #59's
|
||
decomposition, now escalated by the feedback-notice. The prior parked dev thread
|
||
remains `/goal plan-and-execute #64`'s graduated design, untouched by this interrupt.)
|