Files
session-history/dev-claude-plugin/0077/SESSION-0077.0-TRANSCRIPT-2026-06-22T08-23--2026-06-22T08-37.md
T

5.2 KiB
Raw Blame History

Session 0077.0 — Transcript

App: dev-claude-plugin Start: 2026-06-22T08-23 (PST) End: 2026-06-22T08-37 (PST) Type: planning-and-executing Posture: yolo Claude-Session: f4514902-147b-4807-bd13-c6fc2de3ca3f Anchor: design engineering/docs/sdl-pipeline-refactor-brief.md (R2a) · Feature #126 · Epic #125 Status: FINALIZED

Launch prompt

/goal next → F2 (wgl-brainstorming --lenses brd|prd) — resume the stored next goal: F2 of the staged-gate SDLC refactor Epic.

Plan

Goal (F2 / #126): extend wgl-brainstorming so each design-track lens is an individually-gated, accreting stage selected by --lenses brd|prd.

Tasks:

  1. lenses-for-type.sh (new, wgl-session-common/scripts/) — deterministic §4.2 mapping issue-type → applicable lenses (feature → REQUIRED brd prd; leaf story/task/bug → SKIPPABLE; epic → NONE), --type (pure) + --repo/--issue (resolved) paths. Offline test test-lenses-for-type.sh.
  2. wgl-brainstorming/SKILL.md — add the --lenses brd|prd parameter; BRD run authors the business lens, PRD run accretes the product lens (+ design-vs- code decision) into the SAME SPEC, each ending at a terminal review gate; lens applicability via the new script; cite F1's reconciled handbook; keep no---lenses whole-spec behavior as the bridge until F3/F5.
  3. Version bump 0.56.0 → 0.57.0.
  4. Lint + branch → PR → merge.

Session arc

  1. Routed the /goal next → F2 opener through the session gate → a planning-and-executing (coding) session; invoked wgl-planning-and-executing.
  2. Claimed session 0077 (peek showed 6 stale --INPROGRESS placeholders, 0035/0048/0058/0065/0068/0068/0076 — 913 days old, none live; already isolated in worktree elastic-mccarthy-069d00, so §5.4 satisfied).
  3. Oriented on F2 from the locked brief (engineering/docs/sdl-pipeline-refactor-brief.md, design-track steps 12) and issue #126 (full acceptance criteria fetched).
  4. Eligibility gate (Step 8.5): #126 is type/feature → INELIGIBLE as a bare feature (R3); ELIGIBLE anchored on the locked brief (R2a). Anchored on the brief — rationale logged in Deferred decisions.
  5. Read F1's reconciled handbook (§3.3 accretion + the lens→section table; §4.3 R1R3 lens-by-type) so the skill prose CITES rather than restates (§4.1).
  6. Built lenses-for-type.sh TDD: wrote test-lenses-for-type.sh (red, 0/14) → implemented the script → green (14/14). Modeled on check-issue-eligibility.sh / test-issue-eligibility.sh (stub gitea-api via fake CLAUDE_PLUGIN_ROOT).
  7. Edited wgl-brainstorming/SKILL.md: new ## The --lenses brd|prd parameter section (param, accretion-into-one-SPEC, terminal gate / no hand-off, type-applicability via the new script, Engineering lens = F3's wgl-tech-design, transitional no---lenses default); Step 8.5 +point 5 (lens-applicability check); Step 9 points 34 made lens-scoped + terminal. Caught + fixed an inline-CLI-comment violation in a command block (no-inline-cli-comments).
  8. Version bump 0.56.0 → 0.57.0.
  9. Verified: new test 14/14; full wgl-session-common test sweep green (no regressions); scripts/lint.sh --check-bump clean (shellcheck skipped — not installed locally).
  10. Shipped: committed (29326e3), pushed, opened PR #130, merged to main (bfa8efe), #126 closed via Fixes #126.
  11. Finalize: made 0.57.0 live (update-plugin.sh, 0.56.0→0.57.0); updated memory (project + sdlc-refactor + index); tore down the worktree; published this transcript.

Pipeline status (§9)

dev-claude-plugin is a Claude Code plugin (skills + docs + hooks), not a flotilla-deployed UI app — it has no localhost/PPE/prod pipeline stage. Its "ship" equivalent is the version bump made live for the next session via update-plugin.sh (done, 0.57.0). No E2E/PPE stage to run.

Deferred decisions

  • Anchor = the locked Epic brief, not a per-Feature Solution Design. #126 is type/feature, which R3 refuses for direct planning. Anchored instead on engineering/docs/sdl-pipeline-refactor-brief.md (ELIGIBLE R2a) because: the brief is the locked source-of-record carrying F2's full business/product/eng intent; this is a bootstrap Epic building the very per-Feature staged-design process that does not yet exist (it cannot be required to build itself); F1 shipped the same way. R3's purpose (a contract to judge the code against) is met by the brief + #126's acceptance criteria. Low-confidence-but-deliberate; would have liked a nod but proceeded under yolo.

Next session

F3 — wgl-tech-design (#127, Epic #125): a new gate-lifter session type authoring the SPEC Engineering lens (architecture/contract only — no task breakdown, which stays the plan's Tasks), accreting after brd/prd into the same SPEC, ending at its own gate → SPEC complete. Reuse F2's lenses-for-type.sh. Anchor on the locked brief (R2a; #127 is type/feature, bare-ineligible).

/goal F3 — wgl-tech-design (#127): new gate-lifter authoring the SPEC Engineering lens, accreting after brd/prd

⚠️ Still outstanding (from session 0075): rotate the leaked wgl-gitea-issues-readwrite-token Keychain secret (§6.3).