74 lines
3.2 KiB
Markdown
74 lines
3.2 KiB
Markdown
# Session 0012.0 — Transcript
|
|
|
|
> App: engineering
|
|
> Start: 2026-06-10T12-56 (PST)
|
|
> End: 2026-06-10T12-56 (PST)
|
|
> Type: capture
|
|
> Claude-Session: 14e70ece-05cd-43df-b5c3-7ffd71534ef5
|
|
> Status: **FINALIZED**
|
|
|
|
## Launch prompt
|
|
|
|
```
|
|
Add the gitea VM service-account scope-fix maintenance window as a Gitea issue — P0, type task. (Trailing capture gesture after session 0011 finalized; operator-requested.)
|
|
```
|
|
|
|
## Plan
|
|
|
|
Tracked-lite **capture**: file one typed, source-linked Gitea issue for the
|
|
deferred Gitea-forge backup blocker (the VM service-account scope-fix maintenance
|
|
window), at the operator's request. No spec/plan artifact (capture submits none).
|
|
|
|
## Pre-state
|
|
|
|
- Sessions 0010 (brainstorming — graduated `specs/gitea-forge-backups.md`) and
|
|
0011 (planning-and-executing — SLICE-1 prep, PR #33) already finalized this
|
|
conversation.
|
|
- The scope-fix blocker (VM on `devstorage.read_only`, needs a maintenance window
|
|
to reach `cloud-platform`) was deferred in 0011 and lived only in memory + the
|
|
infra doc's PENDING box.
|
|
|
|
## Session arc
|
|
|
|
1. Operator asked to add the scope-fix maintenance window as a Gitea issue (P0,
|
|
type `task`).
|
|
2. Ensured capture labels exist on `wiggleverse/engineering`, then filed **issue
|
|
#34** via `capture-issues.sh --type task --priority P0` — body carries the exact
|
|
stop→set-service-account→start commands, the downtime/coordination note, a
|
|
done-when checklist, and refs to the design (§6.7 D-3 / §7.2 SLICE-1), the
|
|
runbook, and PR #33.
|
|
3. Cross-linked #34 on the feature issue **#30** so the blocker is visible there.
|
|
4. Operator invoked `/wgl-session-finalize`. Recorded this trailing capture as
|
|
session 0012 (the prior two were already finalized).
|
|
|
|
## Cut state (final)
|
|
|
|
- **Issue #34** (P0, `type/task`) filed on `wiggleverse/engineering`:
|
|
"Raise gitea VM service-account scope to cloud-platform (maintenance window) —
|
|
unblocks backup uploads." Cross-linked from #30.
|
|
- No repo changes this session (tracker-only); `main` clean.
|
|
- Memory note for the backup feature updated to cite #34.
|
|
|
|
## Deferred decisions
|
|
|
|
- **Recorded the trailing capture as its own session (0012).** Sessions 0010/0011
|
|
were already finalized when the #34 filing happened, so this material capture
|
|
work was untracked; per the finalize protocol (always end with a published
|
|
transcript) it gets its own tracked-lite record rather than being left off the
|
|
books.
|
|
- **Session 0009 left untouched.** It is owned by a *different* conversation
|
|
(`Claude-Session de385d79…`, a brainstorming session on issue #32) — not this
|
|
one — so it is not mine to adopt/finalize (session-ownership-by-stamp).
|
|
|
|
## Operator plate
|
|
|
|
- The backup work's next move is unchanged and now tracked as **#34**: schedule
|
|
the brief `git.wiggleverse.org` maintenance window to raise the VM SA scope,
|
|
then finish SLICE-1's write-test and build SLICE-2.
|
|
|
|
## Next-session prompt
|
|
|
|
```
|
|
/goal Do the gitea VM service-account scope maintenance window (#34: stop → set-service-account --scopes=cloud-platform → start, per infra/deploy-gitea-on-gcp.md Backups box), then finish SLICE-1 (verify the VM can write to gs://wiggleverse-gitea-backups) and build SLICE-2 scheduled dump+upload, per specs/gitea-forge-backups.md §7.2 (engineering#30)
|
|
```
|