141 lines
7.6 KiB
Markdown
141 lines
7.6 KiB
Markdown
# Session 0061.0 — Transcript
|
||
|
||
> App: dev-claude-plugin
|
||
> Start: 2026-06-11T07-43 (PST)
|
||
> End: 2026-06-11T07-56 (PST)
|
||
> Type: capture (tracked-lite)
|
||
> Claude-Session: f8b30927-1ee7-44ba-b076-fb4f8acbe560
|
||
> Status: FINALIZED
|
||
|
||
## Launch prompt
|
||
|
||
```
|
||
/goal next
|
||
```
|
||
|
||
Resolved from memory's stored `Next /goal:` field (written at session 0060's
|
||
finalize): *resume the capture — review/finish/file the 5 UNFILED
|
||
workflow-engine drafts from session 0059 in the content repo `issues/`
|
||
(wgl-triage first; reconcile eligibility-gate vs #89/#90's enforcement Feature;
|
||
settle promote-gesture's target tracker)*. Classified **capture** →
|
||
`wgl-capture` invoked as the gate lifter.
|
||
|
||
## Pre-state
|
||
|
||
- Plugin repo on `main` == `origin/main` (0.49.0); only pre-existing untracked
|
||
`docs/superpowers/specs/2026-06-09-wgl-capture-mvp-design.pdf` in the tree.
|
||
- Claim-peek showed three `--INPROGRESS` placeholders: 0035 / 0048 (known
|
||
stale) and **0058** (brainstorming, started 2026-06-10T21-25 — the Phase-1
|
||
SDL gap-analysis session whose discussion spawned this Feature set).
|
||
- Memory said the five 0059 drafts were UNFILED, structural blocks + Solution
|
||
notes unauthored.
|
||
|
||
## Session arc
|
||
|
||
1. **Claimed 0061** (capture, tracked-lite). No worktree — capture writes only
|
||
the content repo's `issues/` working tree; slug coordination per 0059's
|
||
precedent.
|
||
2. **Stale-premise discovery.** `list-unfiled-drafts.sh --all` reported all
|
||
five drafts **filed**: `capture-issues.sh` markers pointing at issues
|
||
**#109–#113**, created 2026-06-10 22:56 PST — inside still-open session
|
||
0058's window, after capture 0059 ended (21:55–22:17) — and the stamped
|
||
drafts committed to the content repo at `b59a0be` (22:58). The filed bodies
|
||
were the **business blocks only**: no Scope/non-goals, no
|
||
Assumptions·constraints·dependencies, **no Source/signal (an INV-2 gap)**,
|
||
no WSJF line, no Decomposition, no Solution notes. The goal's "finish the
|
||
drafts" therefore became "complete the filed issue bodies on the tracker."
|
||
3. **Context assembly.** Read all five business blocks (sound; no solution
|
||
leakage, no tautological pain) and the related issues: #89/#90/#91 (the
|
||
triage-gate Epic and its Features), #99 (the workflow-engine Epic with the
|
||
0059 A2/A3 staging amendment), #95/#96/#100/#101 (the amended siblings).
|
||
4. **Completed all five issue bodies** (PATCH, appending the structural block +
|
||
Solution notes to the approved business block — earlier content honored
|
||
verbatim, INV-7):
|
||
- **#109 wgl-triage** (P1) — blocked-by #90 (writes its vocabulary);
|
||
consumed by #91/#96/#110; verdicts never auto-apply in either posture;
|
||
two deterministic verbs + recommend-and-confirm loop sketched.
|
||
- **#110 A2 design-task spawn** (P2) — parent #99; blocked-by #90 and #109
|
||
(the accept verdict is the hook); idempotent `spawn-design-task.sh`
|
||
sketched; materializes §4.3 R3.
|
||
- **#111 A3 slice-issues spawn** (P2) — parent #99; owns the Capture RFC
|
||
§8.1 / handbook §7 doc-flip deliverable (slices are child issues; plan
|
||
steps stay out); unblocks #95/#96/#100 mechanics; trigger seam = the
|
||
brainstorming finalize after `submit-spec.sh`.
|
||
- **#112 open-blockers session gate** (P2) — parent #99; **reconciled vs
|
||
#91** (see below); extends `check-issue-eligibility.sh` with a
|
||
dependency-completeness predicate, R1–R4-standard override.
|
||
- **#113 promote gesture** (P2) — tracker decision recorded (see below);
|
||
credential-custody open question assigned to its design (R3);
|
||
`ppe-before-prod` named binding.
|
||
5. **Reconciliation #112 vs #91 (the goal's ⚠️ item):** kept **both**,
|
||
deliberately. #91 enforces the **triage-state** gate where collections of
|
||
work are selected (Epic #89: *is this issue sanctioned?*); #112 enforces
|
||
**dependency completeness** where a session anchors (Epic #99: *are its
|
||
prerequisites done?*). Same chokepoint discipline, different fact verified;
|
||
their designs should share one deterministic helper (two predicates — #96's
|
||
ready set composes exactly these). Recorded in #112's body and as comment
|
||
`#91#issuecomment-1548`.
|
||
6. **#113 tracker settled:** stays on the **plugin** tracker — the gesture is
|
||
a session-skill seam (the NL layer); the deterministic rollout capabilities
|
||
belong to flotilla-core, and gaps its design finds there are filed on
|
||
flotilla-core's tracker as blockers. Recorded in the body.
|
||
7. **#99 child map commented** (`#99#issuecomment-1553`): A2 = #110, A3 =
|
||
#111, enforcement backstop = #112, triage host = #109.
|
||
8. **Draft disposition (Step 7 / INV-8):** the five filed draft copies deleted
|
||
from the content repo (`git rm`, commit `3f35f07`, pushed) — Gitea is the
|
||
system of record and the committed copies would have drifted from the
|
||
extended bodies; history preserves the originals at `b59a0be`.
|
||
9. **Finalize:** no plugin source change (no version bump); `update-plugin.sh`
|
||
confirmed the pin already live at 0.49.0 (this session loaded 0.48.0,
|
||
claimed before the prior finalize's bump took effect); memory + next-goal
|
||
updated; transcript published.
|
||
|
||
## Not done / left as-is
|
||
|
||
- **Native Gitea dependency wiring skipped**: POST
|
||
`/issues/{n}/dependencies` returned 404 (`IsErrRepoNotExist`) with the
|
||
issue-scoped token — likely missing repo-lookup scope. Blocked-by relations
|
||
live in the issue bodies; the native-deps-vs-body-links choice is explicitly
|
||
#110/#111's design call.
|
||
- Session 0058 remains `--INPROGRESS` (a live or sleeping brainstorming
|
||
session — not mine to adopt mid-flight).
|
||
- The pre-existing untracked design PDF in the plugin tree, untouched.
|
||
|
||
## Deferred decisions
|
||
|
||
- **Proceeded without per-block operator review pauses** (INV-7's batching
|
||
profile assumes an interactive dev): the structural content derives directly
|
||
from the operator-dictated 0059 amendments on #90/#95/#96/#99/#100/#101, and
|
||
the issues were already filed — the completed bodies are reviewable on the
|
||
tracker. Alternative: leave the issues half-bodied until an interactive
|
||
session; rejected as that re-parks the recorded goal.
|
||
- **Kept #112 separate from #91** rather than merging — different fact
|
||
verified, different Epic; merging would stretch #91 across both. Recorded on
|
||
both issues for the designs to honor or overturn.
|
||
- **#113 kept on the plugin tracker** (vs filing on flotilla-core) — the ask
|
||
is the in-session gesture; flotilla-core gaps become blockers there.
|
||
- **Deleted the committed draft copies** even though committing them
|
||
(`b59a0be`) looked deliberate: INV-8 / feedback #80 makes deletion-on-file
|
||
the default in both postures and "keep" an explicit dev exception with no
|
||
record here; git history preserves them.
|
||
- **No worktree isolation** despite 0058 live-ish at claim — capture wrote
|
||
only the content repo working tree (unique slugs), matching 0059's logged
|
||
precedent.
|
||
|
||
## Operator plate
|
||
|
||
- **Review the five completed bodies** on the tracker if desired:
|
||
https://git.wiggleverse.org/wiggleverse/wiggleverse-dev-claude-plugin/issues/109
|
||
…/110 …/111 …/112 …/113 (each: business block from 0059 + structural block +
|
||
Solution notes from this session).
|
||
- Session 0058 (brainstorming, SDL gap analysis) is still `--INPROGRESS` —
|
||
finalize or adopt it when convenient.
|
||
- `/clear` or restart still needed in any session that loaded ≤0.48.0 to pick
|
||
up the live 0.49.0 pin.
|
||
|
||
## Next-session prompt
|
||
|
||
```
|
||
/goal plan and execute #79 — build Phase 1 (capture-side) of issue-type validation from its graduated design (content repo specs/2026-06-10-issue-type-validation-design.md): SLICE-1 the shared §4.3-citing type-fit judge + ensure-typecheck-labels.sh/mark-type-ok.sh, then SLICE-2 wire the judge into wgl-capture Step 4/6
|
||
```
|