Session 0016.0 — Transcript

App: ecomm Type: coding Date: 2026-06-04 (PST) · Start 01-20 · End 05-14 Goal: ship the next roadmap item (merged to main) Outcome: R05 merged + R06 online-store/preferences built and merged to main; gate green at 189 tests.

Plan

/wgl-coding-session-init → operator: "Goal set: Next roadmap item", with the standing rule a goal is not achieved until merged to main. Baseline was on the unmerged r05-customers-customer-list branch (PR #4 open). Plan that emerged:

  1. Merge R05/PR #4 to restore a clean main baseline.
  2. Build R06 online-store/preferences (21 scenarios, 09.02.00010021) end-to-end via the established cadence: design spec → TDD plan → execute → PR → merge.

Pre-session state

  • On branch r05-customers-customer-list, clean + pushed, 2 commits ahead of origin/main — R05 built & green (151 tests) but not merged (PR #4 open).
  • Roadmap frontier: R01R05 + R07 shipped; R06 online-store/preferences the next unshipped Wave-1 foundation.

Turn-by-turn arc

  1. Session init (0016 claimed). No other sessions in flight at claim time. Surveyed git: R05 unmerged on a feature branch. Surfaced the unclean baseline.
  2. Merged R05/PR #4main (5fe20d9) via the Gitea API; fast-forwarded local main, deleted the merged branch, ran the gate (151 green). Updated memory.
  3. R06 brainstorming. Read the 21 BDD scenarios + the existing customers/content patterns. Surfaced the three load-bearing design decisions via AskUserQuestion; operator approved all as recommended:
    • new online_store domain (vs. extending store);
    • the unbuilt-dependency behaviours become tested seams now (R05 set_customer_stats pattern) rather than deferred scenarios;
    • favicon/social image reuse the content files domain for byte storage.
  4. Design spec written + committed (docs/superpowers/specs/2026-06-04-r06-*-design.md, SPEC §13 lands at build time). Self-reviewed (fixed a GraphQL/REST favicon inconsistency).
  5. Implementation plan written + committed (docs/superpowers/plans/2026-06-04-r06-*.md) — 8 TDD tasks, concrete code per step, self-reviewed for spec coverage / placeholders / type consistency.
  6. Executed (inline, batched). New online_store domain + migration 0008; ICO added to content.ACCEPTED; online-store staff section; REST + GraphQL wiring; one test per scenario + GraphQL parity + section gate (38 new tests). Gate green at 189 tests, layering KEPT.
  7. Docs: SPEC §13 + §6 seam-deferral note, MAP domain/lookup rows, ROADMAP R06 → , health release string → R04+R05+R06+R07.
  8. Finished the branch: pushed r06-online-store-preferences, opened Gitea PR #5, merged to main (20ea29f), fast-forwarded local main, deleted the branch. Gate green on main.
  9. Plugin upgrade mid-session (0.8.0 → 0.10.0); finalized via the new unified wgl-session-finalize.

Deferred decisions / low-confidence calls

  • setPasswordMessage folded into update_preferences. The design spec §6 listed a dedicated setPasswordMessage GraphQL mutation; in implementation the password-page message (09.02.0012) is just a non-sensitive field in the update_preferences PATCH, so a separate mutation was dropped as redundant. Behaviour and the scenario test are unchanged. Easy to add a dedicated mutation later if a UI wants it. (The three load-bearing design calls were operator-approved up front, not deferred.)

Cut state (end of session)

  • main @ 20ea29f — R01R07 all merged. Gate green, 189 tests.
  • Cross-repo: none — all R06 work is in wiggleverse-ecomm.
  • Commit trail (this session, on main):
    • 5fe20d9 merge PR #4 (R05)
    • 3660700 docs(R06) design spec · 0b89de0 docs(R06) plan
    • d6e4f99 feat(R06) domain + GraphQL/REST + 21-scenario tests
    • a864b14 docs(R06) SPEC §13 + MAP/ROADMAP/health
    • 20ea29f merge PR #5 (R06)

What lands on the operator's plate

  • PR #6 docs/retire-ecomm-prototype (by ben.stull, mergeable) is open and not part of this session — a separate docs effort (drops the retired prototype repo from app.json/README/SPEC; companion meta PR #1). The working tree is currently checked out on that branch. Operator chose to leave it for its own session — do not disturb it.
  • No other outstanding items; R06 is fully shipped.

Prompt the operator can paste into the next session

The next item is a fresh roadmap pick (no in-flight resume pointer — R06 is done). Wave-1 has three small foundations left (R08/R09/R10); the Wave-2 keystone R15 orders is also unblocked. Recommended next:

/goal Build R08 settings/brand (7 scenarios, 13.02.0001-0007), per wiggleverse-ecomm/ROADMAP.md — new foundation slice; alternatively R09 settings/plan, R10 settings/policies, or the Wave-2 keystone R15 orders (70 scenarios). First read memory project_ecomm_build.md. Note: PR #6 docs/retire-ecomm-prototype is a separate in-flight effort — leave it; start R08 from a clean main.