add ecomm/0016/SESSION-0016.0-TRANSCRIPT-2026-06-04T01-20--2026-06-04T05-14.md + replace placeholder/variant SESSION-0016.0-TRANSCRIPT-2026-06-04T01-20--INPROGRESS.md
This commit is contained in:
@@ -0,0 +1,92 @@
|
||||
# Session 0016.0 — Transcript
|
||||
|
||||
> App: ecomm
|
||||
> Type: coding
|
||||
> Date: 2026-06-04 (PST) · Start 01-20 · End 05-14
|
||||
> Goal: ship the next roadmap item (merged to `main`)
|
||||
> Outcome: **R05 merged + R06 `online-store/preferences` built and merged to `main`**; gate green at 189 tests.
|
||||
|
||||
## Plan
|
||||
|
||||
`/wgl-coding-session-init` → operator: "Goal set: Next roadmap item", with the standing
|
||||
rule **a goal is not achieved until merged to `main`**. Baseline was on the unmerged
|
||||
`r05-customers-customer-list` branch (PR #4 open). Plan that emerged:
|
||||
|
||||
1. Merge R05/PR #4 to restore a clean `main` baseline.
|
||||
2. Build **R06 `online-store/preferences`** (21 scenarios, `09.02.0001–0021`) end-to-end
|
||||
via the established cadence: design spec → TDD plan → execute → PR → merge.
|
||||
|
||||
## Pre-session state
|
||||
|
||||
- On branch `r05-customers-customer-list`, clean + pushed, 2 commits ahead of
|
||||
`origin/main` — R05 built & green (151 tests) but **not merged** (PR #4 open).
|
||||
- Roadmap frontier: R01–R05 + R07 shipped; R06 `online-store/preferences` the next
|
||||
unshipped Wave-1 foundation.
|
||||
|
||||
## Turn-by-turn arc
|
||||
|
||||
1. **Session init (0016 claimed).** No other sessions in flight at claim time. Surveyed
|
||||
git: R05 unmerged on a feature branch. Surfaced the unclean baseline.
|
||||
2. **Merged R05/PR #4** → `main` (`5fe20d9`) via the Gitea API; fast-forwarded local
|
||||
`main`, deleted the merged branch, ran the gate (151 green). Updated memory.
|
||||
3. **R06 brainstorming.** Read the 21 BDD scenarios + the existing `customers`/`content`
|
||||
patterns. Surfaced the three load-bearing design decisions via `AskUserQuestion`;
|
||||
operator approved all as recommended:
|
||||
- new `online_store` domain (vs. extending `store`);
|
||||
- the unbuilt-dependency behaviours become **tested seams now** (R05
|
||||
`set_customer_stats` pattern) rather than deferred scenarios;
|
||||
- favicon/social image **reuse the `content` files domain** for byte storage.
|
||||
4. **Design spec** written + committed (`docs/superpowers/specs/2026-06-04-r06-*-design.md`,
|
||||
SPEC §13 lands at build time). Self-reviewed (fixed a GraphQL/REST favicon inconsistency).
|
||||
5. **Implementation plan** written + committed (`docs/superpowers/plans/2026-06-04-r06-*.md`)
|
||||
— 8 TDD tasks, concrete code per step, self-reviewed for spec coverage / placeholders /
|
||||
type consistency.
|
||||
6. **Executed** (inline, batched). New `online_store` domain + migration `0008`; ICO added
|
||||
to `content.ACCEPTED`; `online-store` staff section; REST + GraphQL wiring; one test per
|
||||
scenario + GraphQL parity + section gate (38 new tests). Gate green at **189 tests**,
|
||||
layering KEPT.
|
||||
7. **Docs**: SPEC §13 + §6 seam-deferral note, MAP domain/lookup rows, ROADMAP R06 → ✅,
|
||||
health `release` string → `R04+R05+R06+R07`.
|
||||
8. **Finished the branch**: pushed `r06-online-store-preferences`, opened Gitea **PR #5**,
|
||||
merged to `main` (`20ea29f`), fast-forwarded local `main`, deleted the branch. Gate
|
||||
green on `main`.
|
||||
9. **Plugin upgrade** mid-session (0.8.0 → 0.10.0); finalized via the new unified
|
||||
`wgl-session-finalize`.
|
||||
|
||||
## Deferred decisions / low-confidence calls
|
||||
|
||||
- **`setPasswordMessage` folded into `update_preferences`.** The design spec §6 listed a
|
||||
dedicated `setPasswordMessage` GraphQL mutation; in implementation the password-page
|
||||
message (09.02.0012) is just a non-sensitive field in the `update_preferences` PATCH, so
|
||||
a separate mutation was dropped as redundant. Behaviour and the scenario test are
|
||||
unchanged. Easy to add a dedicated mutation later if a UI wants it. (The three
|
||||
load-bearing design calls were operator-approved up front, not deferred.)
|
||||
|
||||
## Cut state (end of session)
|
||||
|
||||
- `main` @ `20ea29f` — R01–R07 all merged. Gate green, **189 tests**.
|
||||
- Cross-repo: none — all R06 work is in `wiggleverse-ecomm`.
|
||||
- Commit trail (this session, on `main`):
|
||||
- `5fe20d9` merge PR #4 (R05)
|
||||
- `3660700` docs(R06) design spec · `0b89de0` docs(R06) plan
|
||||
- `d6e4f99` feat(R06) domain + GraphQL/REST + 21-scenario tests
|
||||
- `a864b14` docs(R06) SPEC §13 + MAP/ROADMAP/health
|
||||
- `20ea29f` merge PR #5 (R06)
|
||||
|
||||
## What lands on the operator's plate
|
||||
|
||||
- **PR #6 `docs/retire-ecomm-prototype`** (by ben.stull, mergeable) is open and **not part
|
||||
of this session** — a separate docs effort (drops the retired prototype repo from
|
||||
app.json/README/SPEC; companion meta PR #1). The working tree is currently checked out on
|
||||
that branch. Operator chose to **leave it** for its own session — **do not disturb it.**
|
||||
- No other outstanding items; R06 is fully shipped.
|
||||
|
||||
## Prompt the operator can paste into the next session
|
||||
|
||||
The next item is a fresh roadmap pick (no in-flight resume pointer — R06 is done). Wave-1
|
||||
has three small foundations left (R08/R09/R10); the Wave-2 keystone R15 `orders` is also
|
||||
unblocked. Recommended next:
|
||||
|
||||
```
|
||||
/goal Build R08 settings/brand (7 scenarios, 13.02.0001-0007), per wiggleverse-ecomm/ROADMAP.md — new foundation slice; alternatively R09 settings/plan, R10 settings/policies, or the Wave-2 keystone R15 orders (70 scenarios). First read memory project_ecomm_build.md. Note: PR #6 docs/retire-ecomm-prototype is a separate in-flight effort — leave it; start R08 from a clean main.
|
||||
```
|
||||
@@ -1,13 +0,0 @@
|
||||
# Session 0016.0 — Transcript
|
||||
|
||||
> App: ecomm
|
||||
> Start: 2026-06-04T01-20 (PST)
|
||||
> Status: **PLACEHOLDER — claimed at session start; finalized at session end.**
|
||||
>
|
||||
> This file reserves session ID 0016 for ecomm. The driver replaces this
|
||||
> body with the full transcript and renames the file to its final
|
||||
> SESSION-0016.0-TRANSCRIPT-2026-06-04T01-20--<end>.md form at session end.
|
||||
|
||||
## Launch prompt
|
||||
|
||||
_(launch prompt not captured at claim time)_
|
||||
Reference in New Issue
Block a user