106 lines
5.9 KiB
Markdown
106 lines
5.9 KiB
Markdown
# Session 0018.0 — Transcript
|
||
|
||
> App: engineering
|
||
> Start: 2026-06-10T21-50 (PST) · End: 2026-06-11T21-10 (PST)
|
||
> Type: planning-and-executing
|
||
> Claude-Session: c11b0724-4bbf-455d-96cb-b261c0865ed2
|
||
> Anchor: design `specs/gitea-forge-backups.md` (engineering#30) — SLICE-3; eligibility ELIGIBLE (R2a)
|
||
> Status: **FINALIZED** — SLICE-3 complete (PR #54 merged 2026-06-11)
|
||
|
||
## Launch prompt
|
||
|
||
```
|
||
/goal slice-3
|
||
(Resume gitea-forge-backups work — engineering#30, specs/gitea-forge-backups.md. SLICE-1 and SLICE-2 complete; this session plans and executes SLICE-3.)
|
||
```
|
||
|
||
## Pre-state
|
||
|
||
- `main` clean; SLICE-2 (4-hourly `gitea-backup.timer` + script) merged by session
|
||
0017 the same evening. Sessions 0009 and 0017 in flight (`--INPROGRESS`) at claim
|
||
time → this session ran isolated in the operator-pre-created worktree
|
||
`.claude/worktrees/gitea-backups-slice-2`, branching
|
||
`worktree-gitea-backups-slice-3` off `origin/main`.
|
||
- Scratch bucket `gs://wiggleverse-gitea-backups-scratch` left from SLICE-2's T-1
|
||
gate: no versioning, no lifecycle, 2 leftover test objects.
|
||
- Prod bucket `gs://wiggleverse-gitea-backups`: versioning on, committed lifecycle
|
||
applied (30d delete + 7d noncurrent purge); live 4-hourly ~1.1 GB dumps landing.
|
||
|
||
## Plan
|
||
|
||
Plan doc: `docs/superpowers/plans/2026-06-10-gitea-backups-slice-3.md` (merged with
|
||
the slice; archived to `plans/` at finalize). Approach: prove T-4 (spec §6.8) on the
|
||
scratch bucket — mirror prod config (versioning + both prod rules verbatim) plus a
|
||
`daysSinceCustomTime: 30` test rule, since `age` cannot be back-dated; seed
|
||
over-age / in-window / versioned-pair fixtures; poll a deterministic verify script
|
||
until the asynchronous GCS lifecycle pass runs; record the proof; ship via PR. No
|
||
prod mutation (drift-check only).
|
||
|
||
## Arc (turn by turn)
|
||
|
||
1. **Init** — session gate → `wgl-planning-and-executing`; claimed 0018; baseline
|
||
verified clean; R2/R3 gate: ELIGIBLE (R2a, graduated design).
|
||
2. **Tasks 1–4 (evening 06-10)** — scratch versioning enabled + T-4 lifecycle
|
||
applied (`infra/gitea-backup/t4-scratch-lifecycle.json`); prod drift-checked
|
||
clean; `infra/gitea-backup/t4-retention-check.sh` (seed/verify) written;
|
||
fixtures seeded (overage customTime 2026-04-27; inwindow; versioned pair);
|
||
verify PENDING path exercised (exit 1); branch pushed; checkpoint published.
|
||
30-min monitor armed (48 h deadline).
|
||
3. **Operator detour (morning 06-11)** — cost question answered with real numbers
|
||
(~1.1 GB/dump; hourly+7d ≈ $11/mo incl. noncurrent + soft-delete tails);
|
||
operator decision: **keep 30 days / 4 hours** (no spec change).
|
||
4. **False VIOLATION (~13 h in)** — monitor reported "in-window object deleted".
|
||
Systematic-debugging root cause: **expired gcloud token** ("Reauthentication
|
||
failed; cannot prompt during non-interactive execution") made both listings
|
||
fail; the script's `2>/dev/null … || true` read that as zero objects. **No data
|
||
was lost.** Fix shipped (commit `07266be`): verify fails closed — listing
|
||
failure is exit 3 CHECK-ERROR (distinct from gcloud's "matched no objects" =
|
||
legitimately empty), never a violation. The broken auth itself was the failing
|
||
test (old: exit 2 wrong → new: exit 3). Monitor re-armed auth-aware.
|
||
5. **Auth restored (evening 06-11)** — first login refreshed the wrong account;
|
||
the gitea config needs `ben.stull@wiggleverse.org` specifically; second login
|
||
pinned to it. **T-4 GREEN** on the next check: over-age purged from the live
|
||
set (demoted to a noncurrent version per versioning semantics), in-window
|
||
object + prior noncurrent version intact (INV-5).
|
||
6. **Ship** — infra doc build-state bullet (SLICE-3) + spec changelog v0.2.2
|
||
(Version field also bumped from the stale v0.2.0); PR #54 → merged to `main`
|
||
(`a0c93c5d`, remote branch deleted); issue #30 comment #1625; plan archived
|
||
(`plans/2026-06-10-gitea-backups-slice-3.md` at `9c8926f`); memory updated
|
||
(next: SLICE-4).
|
||
|
||
## Deferred decisions
|
||
|
||
- **T-4's over-age trigger is `daysSinceCustomTime: 30`, not prod's `age: 30`** —
|
||
`age` cannot be back-dated; executing the literal prod rule means 30 days of
|
||
wall clock. Same threshold, same lifecycle Delete engine; substitution recorded
|
||
in the infra doc. Alternative: a scaled `age: 1` scratch policy (slower, needs
|
||
mid-wait uploads). Confidence high, but it is a fidelity call.
|
||
- **The 7-day noncurrent purge is config-verified, not execution-verified** —
|
||
executing it adds ≥ 7 days for the same Delete machinery already exercised.
|
||
Versioning *protection* (prior versions survive) IS execution-verified.
|
||
- **Worktree left in place at finalize** — branch merged + tree clean (teardown
|
||
gate satisfied), but the worktree (`.claude/worktrees/gitea-backups-slice-2`)
|
||
was operator-pre-created, not session-created, with sessions 0009/0017 still
|
||
unfinalized — so it was flagged rather than removed.
|
||
|
||
## Cut state / operator plate
|
||
|
||
- **Shipped & verified:** SLICE-3 complete on `main` (PR #54); T-4 green
|
||
2026-06-11; prod untouched and drift-clean. Pipeline (§9) status: bootstrap
|
||
infra, no UI/app deploy — the scratch bucket WAS the pre-prod gate per spec
|
||
§7.3; nothing further to deploy.
|
||
- **Scratch bucket kept** for SLICE-4's drill; t4 fixtures self-clean via the
|
||
applied lifecycle (≤ 37 days).
|
||
- **Operator gotcha:** gcloud reauth for `ben.stull@wiggleverse.org` (the `gitea`
|
||
config's account) expires on an org policy cadence; long-running unattended
|
||
gcloud work will hit it. CHECK-ERROR (exit 3) from `t4-retention-check.sh`
|
||
means re-run `gcloud auth login ben.stull@wiggleverse.org`.
|
||
- Sessions 0009 and 0017 remain `--INPROGRESS` (not this session's to adopt —
|
||
they were live-listed at claim time).
|
||
|
||
## Next-session prompt
|
||
|
||
```
|
||
/goal Build gitea-forge-backups SLICE-4 — restore runbook (RB-1/RB-2 → infra/backup-restore-gitea.md) + one proving drill onto a scratch Gitea, T-2 green, drill recorded, per specs/gitea-forge-backups.md §7.2 (engineering#30)
|
||
```
|