Files
session-history/dev-claude-plugin/0021/SESSION-0021.0-TRANSCRIPT-2026-06-07T08-30--2026-06-07T15-58.md
T

98 lines
4.4 KiB
Markdown

# Session 0021.0 — Transcript
> App: dev-claude-plugin
> Start: 2026-06-07T08-30 (PST)
> End: 2026-06-07T15-58 (PST; ended on /clear)
> Type: coding
> Status: **FINALIZED (post-hoc reconstruction).**
> ⚠️ **Reconstructed record.** This session ended on `/clear` without a completed
> finalize — the `session-end-finalize-guard` hook banner-stamped it as
> ended-unfinalized (see below). Its live conversation context was lost; it was
> finalized later, on 2026-06-08, as a best-effort cleanup grounded in the
> placeholder's own Plan section plus git history. Treat this as a reconstruction,
> not a verbatim transcript.
## Launch prompt
```
/goal Ensure that implementation never happens without an implementation plan.
Ensure that implementation plans are never written without a solution design
that includes that slice
```
## Plan (as captured live in the placeholder)
**Goal:** Enforce the build chain in the plugin — no implementation without an
implementation plan; no implementation plan without a Solution Design that
includes that slice.
Recursive by nature: honoring the goal while building it means design → plan →
implement. Session opened as **coding** (operator choice).
**Design decisions (operator-confirmed via AskUserQuestion):**
1. Enforcement strength: **soft, house-style** (verify → route → ask-when-unsure
→ fail open), matching the session-gate + finalize-on-goal posture. No hard
blocking hook.
2. Artifacts (map to existing vocab): Solution Design = SPEC.md / spec-RFC
(§3.3) — or a committed `docs/superpowers/specs/` design doc where a repo
designs in-repo — that *includes the slice*; Implementation Plan =
`docs/superpowers/plans/` (writing-plans output); Implementation = via
superpowers:executing-plans.
3. Scope: **focused enforcement layer only** on the current three session types
(keep spec/coding/discovery names); Effort B (full superpowers realignment +
spec-init→plan-init rename) stays deferred.
**Approach (as planned):** Document the invariant canonically in
SESSION-PROTOCOL.md (docs lead automation, §4.1), then wire coding-init to gate
on it (G1: plan required before implementing; G2: covering Solution Design
required before a plan) and route implementation through
superpowers:executing-plans. Light touch on session-gate + spec-init. Bump
0.17.0 → 0.18.0.
## What actually happened to this work (reconstructed)
The session's planned standalone enforcement layer at 0.18.0 was **not shipped as
planned** — it was redirected:
- **v0.18.0** (PR #13, `275c633`) instead became the *superpowers verbiage
rename* (the three session types → `brainstorming` / `writing-plans` /
`executing-plans`) — the operator's "effort B" realignment that this session's
Plan had explicitly deferred.
- The build-chain invariant this `/goal` was chasing was then absorbed
**structurally** by the **two-session model** (v0.22.0, PR #22): `wgl-writing-plans`
folded into `wgl-brainstorming` (= reviewed spec), and `wgl-planning-and-executing`
came to *own the write-the-plan step* before executing. The build chain is
encoded in the session topology rather than as a separate soft-enforcement hook.
So the `/goal` here is best read as a productive provocation: it surfaced the
"design → plan → implement" chain that the later two-session model made
load-bearing, rather than producing its own merged artifact.
## Pre-existing note (carried from the live placeholder)
> Session 0020 is a dead/unfinalized placeholder whose work (the
> session-end-finalize-guard hook, PR #12) already merged; flagged for cleanup,
> out of scope here.
(That cleanup is the same 2026-06-08 pass that finalized this transcript.)
## Cut state / outcome
- No standalone merged artifact attributable to this session ID; its line of
thought lives on in v0.22.0's two-session model.
- Plugin source is now at v0.23.0; tree clean and pushed.
## Deferred decisions
_None recoverable (context lost on /clear). The live placeholder's
deferred-decisions section was empty._
## Ended-unfinalized banner (original, from the SessionEnd guard)
> ⚠️ This session ENDED WITHOUT A COMPLETED FINALIZE at 2026-06-07T15-58 (PST; reason: clear).
> This placeholder holds only the last local checkpoint; the rich finalize
> (narrative, memory update, PR/branch survey) did not run. The next session
> should ADOPT and finalize this transcript via wgl-session-finalize, which
> replaces this placeholder with the finalized record.