Files
session-history/ecomm/0041/SESSION-0041.0-TRANSCRIPT-2026-06-22T07-06--2026-06-22T07-38.md

118 lines
5.7 KiB
Markdown
Raw Permalink Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Session 0041.0 — Transcript
> App: ecomm
> Start: 2026-06-22T07-06 (PST)
> End: 2026-06-22T07-38 (PST)
> Type: capture
> Posture: careful
> Claude-Session: af2d41d5-d230-4086-a383-1e5f5826db6b
> Status: **FINALIZED**
> Date: 2026-06-22 (PST)
> Goal: Turn the operator's "SDL pipeline refactor — design brief (target state)"
> into typed, source-linked Gitea backlog issues.
> Outcome: **Done.** 6 issues filed (1 Epic + 5 Features) across two trackers,
> fully cross-linked; the brief published to `wiggleverse/engineering` main
> (PR #62, merged) and linked as Source on every issue.
## Launch prompt
```
# SDL pipeline refactor — design brief (target state)
Restructure the Wiggleverse SDLC into a staged, gated pipeline where every
artifact handoff is a review gate. Built with TODAY's five session types — the
new session types don't exist yet (bootstrap).
[... full brief preserved; see docs/sdl-pipeline-refactor-brief.md in
wiggleverse/engineering, which is the verbatim source of record ...]
(Session opened as: CAPTURE — turn this brief into typed, source-linked Gitea issues.)
```
Followed mid-session by the operator's refined filing directive: file the Epic
"Restructure the SDLC into a staged, gated pipeline" on the dev-claude-plugin
tracker decomposing into 5 named Features; save the brief to
`engineering/docs/sdl-pipeline-refactor-brief.md` and link it as the source on
each; note that F1 is engineering-repo work and the rest dev-plugin work.
## Plan
Capture flow (`wgl-capture`, careful posture): claim tracked-lite transcript →
resolve target → assemble/size the asks against handbook §4.3 → draft each issue
in reviewable form → operator-approved decomposition → file → type-fit check →
clean up drafts → finalize.
## Pre-session state
- Launched in an isolated worktree of `wiggleverse-ecomm-content`
(`charming-rosalind-9575d0`), clean on `claude/charming-rosalind-9575d0`.
- The SDLC refactor was un-captured; no Epic/Features existed; no brief on disk.
- Four unrelated unfiled `s42-*` drafts already sat in the dev-plugin content
repo's `issues/` (a prior session's leftovers).
## Turn-by-turn arc
1. **Session gate.** Classified the opening brief; two types plausible
(brainstorming vs planning-and-executing). Asked the operator → **Capture**.
Invoked `wgl-capture`; claimed **ecomm-0041** (capture, careful).
2. **Target resolution.** `ecomm`'s `app.json` declares no tracker, and the work
is plugin + handbook tooling, not ecomm product — a target override (PUC-2).
First operator answer chose "split: plugin + engineering" trackers.
3. **Decomposition.** Sized the brief against §4.3 → an Epic + candidate Features.
Flagged the rolling-wave tension (carve one Feature vs file all). Operator chose
**Epic + all Features** (eyes-open, brief is locked).
4. **First draft set (4 Features) written**, presented for VS Code review.
5. **Refined directive.** Operator restated: Epic on dev-plugin, **5** Features
(added F5 "wiring"; F3 reframed as a new gate-lifter *session*), save+link the
brief, annotate work-repo. Re-asked two forks → **publish brief via branch/PR/I
merge**, and tracker = **split** (F1 → engineering tracker; Epic + F2F5 →
dev-plugin), work-repo noted on each.
6. **Brief published.** Branch `docs/sdl-pipeline-refactor-brief` on engineering →
PR #62 → merged (used the repo-scoped Keychain token via `gitea-api.sh`; the
issue-scoped token 403s on `/pulls`). Brief live on engineering `main`.
7. **Issues filed.** Epic #125 (dev-plugin) first; then F1 engineering#63
(cross-tracker parent ref), F2 #126, F3 #127, F4 #128, F5 #129. All
`typecheck:ok` (judged 6, mismatch 0). Epic decomposition backfilled with child
numbers.
8. **One self-inflicted scare, fixed.** The first Epic-body backfill PATCH hit a
heredoc/stdin clash and wiped Epic #125's body (len 1). Caught it on the
verify, restored the full body (8272 chars) from the draft via a file-based
PATCH, verified.
9. **Cleanup.** Deleted the 6 filed drafts (INV-8). Finalized (this transcript).
## Cut state (end of session)
- **Filed:** Epic dev-plugin#125; F1 engineering#63; F2 #126; F3 #127; F4 #128;
F5 #129. All carry type + priority + Parent #125 + Work-repo + Source link.
- **Brief:** `docs/sdl-pipeline-refactor-brief.md` on engineering `main` (PR #62
merged; branch deleted). Engineering local clone back on `main`, clean.
- **Session repo** (ecomm-content worktree): clean, no commits, nothing to land.
- **Drafts:** 6 SDLC drafts deleted (filed). 4 unfiled `s42-*` drafts remain —
resumable next session, untouched (not this session's).
- **Memory:** added `sdl-pipeline-refactor-captured.md` + index line + Next /goal.
## What lands on the operator's plate
- Nothing blocking. The backlog is filed and visible on both trackers.
- The six issues are `priority` provisional (WSJF best-effort) — re-rank at triage
if desired.
- F1 (engineering#63) is the docs-lead spine and **blocks** F2F5 — it should be
the first to move.
## Prompt the operator can paste into the next session
```
/goal Start F1 of the SDLC pipeline refactor — handbook reconciliation in
wiggleverse/engineering (issue #63). Brainstorm/plan the §3.3 accretion rule,
the §4.3 slice-retirement (Feature = one SPEC = one plan = one execution; Stories
become standalone leaf issues, R2(b)), the solution-design GUIDE/TEMPLATE updates,
and the documented home of the Claude-Design-vs-Code decision. Source of record:
engineering docs/sdl-pipeline-refactor-brief.md. This is the docs-lead spine that
F2F5 (dev-plugin #126129) cite — land it first.
```
## Deferred decisions
_None — careful posture; every fork was put to the operator (session type,
tracker split, decomposition cut, brief-publish method)._