Files
session-history/ecomm/0017/SESSION-0017.0-TRANSCRIPT-2026-06-09T04-01--2026-06-09T10-03.md

89 lines
9.7 KiB
Markdown
Raw Permalink Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Session 0017.0 — Transcript
> App: ecomm
> Start: 2026-06-09T04-01 (PST) · End: 2026-06-09T10-03 (PST)
> Type: **brainstorming** (as stamped) — in practice the **first *capture* session** (no capture session-type exists yet; that's what this session designed)
> Goal: opened to explore the admin MVP for ecomm #8; became — capture a stakeholder transcript into Gitea issues, then design the whole **Capture phase / Gitea-native delivery** model and ship it as an RFC.
> Outcome: RFC merged to `engineering` `main` (PRs #21/#22/#23); plugin **Capture backlog** created (Epic #24 → Features #25 MVP, #26 quality); ecomm asks captured as issues #7#22; engineering #19 closed. **No ecomm spec** produced (capture session — confirmed intentional at finalize).
## Launch prompt
```
Let's talk about what the MVP is from an admin perspective to get to #8. We're going to do #8 before anything else.
```
(Opened against ecomm #8 = "Adult-toys: SKU creation + image/item import from existing data".)
## Plan
1. (Pre) Analyze a pasted stakeholder transcript; break into asks; file as priority-labelled Gitea issues. → ecomm #7#14.
2. Brainstorm the admin MVP for #8 (greenfield — "assume nothing done"). → admin-import MVP design, decomposed into Gitea Epic #8 + units #15#22 + milestone.
3. Pivot: generalize what we did into a process — a **Capture phase** feeding specs (instead of "BDD corpus is the input"). Iterate the model with the operator across many turns.
4. Write the consolidated **RFC**; settle 4 open decisions; merge to engineering. Refine the template (business BDDs; non-binding Solution notes; scope-control motivation).
5. Create the **wgl-capture** Epic + MVP Feature on the plugin repo; close engineering #19 pointing at it.
6. Finalize.
## Pre-session state
ecomm on clean `main` (R01R07 merged, 189 tests green). The session gate classified the opener; routed first to `wgl-session-none` (the initial ask was just "analyze this transcript"), then — when the work became session-worthy — re-gated mid-session to `wgl-brainstorming`, claiming **0017**. No `capture` session type existed (this session is why it's now proposed).
## Turn-by-turn arc
- **Analyze the transcript → issues.** Operator pasted a long recorded conversation (Ben/Hassan/Laura re: a thrift+adult-toys shop, Facebook-album commerce, an e-com migration). Broke it into 8 prioritised asks. Filing needed the Gitea **issue scope** on the admin token — the keychain token was `write:repository` only → labels/issues 403'd. Operator re-scoped the PAT (issue scope) over `wgl-gitea-token-git.wiggleverse.org`. Then created labels `priority/P0..P3` + issues **#7#14**.
- **Admin MVP for #8 (greenfield).** Operator: "assume nothing done; map the user journey, smallest surface area." Q&A settled: flat one-product=one-SKU (kits = a SKU with a BOM, deferred); images via **URL-in-CSV** (importer fetches → stores → attaches); **upsert by SKU** + per-row report; **full web admin slice**; **async job + status page**. Built the journey + capability units → Gitea **Epic #8** + units **#15#22**, milestone "Admin Import MVP (#8)", textual dependency cross-refs (native Gitea dependency API 404'd — repo "Enable dependencies" setting is off, not API-togglable).
- **Pivot to process.** Operator: this issue-granularity is the right capture unit; add a **Capture phase** to the plugin mapping to our eng process; **issues become the input to specs** (not BDD objects). Long collaborative design across many turns:
- Issue template = the **business lens** of the Solution Design.
- Agile size taxonomy **Epic/Feature/Story/Task**; **Feature = the unit = smallest vertical valuable increment = one spec**; standalone Story/Task issues are one-offs.
- **Rolling-wave JIT decomposition**: Epic→next Feature carved at triage, one at a time.
- **Acceptance gate**: only `triaged:accepted` issues feed brainstorming.
- **WSJF** (rejected RICE — Reach meaningless at our scale), in-body + coarse P0P3 labels.
- Confirmed against superpowers: it has **no roadmap concept** — tracks next-step via plan-doc checkboxes; "roadmap" was our invention. → **remove the roadmap**; Gitea board + per-Feature **slice checklists** are the tracker. **slice ↔ superpowers plan = 1-1; spec ↔ plans = N-1.**
- **Gitea-native loop**: "start the next coding session for Feature #xyz" → init reads next unchecked slice; finalize ticks it + files gaps as new issues + closes the Feature. Bookends become Gitea-aware.
- **RFC.** Wrote `engineering/proposals/capture-phase-and-gitea-native-flow.md`. Settled 4 open decisions (AskUserQuestion): §2.5 placement · WSJF in-body+P0P3 · `wgl-capture` tracked-lite · render roadmap on demand. Shipped via worktree-from-`origin/main` → PR **#21** (merge `cbf6a4f`). Engineering checkout was parked on an unrelated feature branch — used a worktree to branch cleanly from `origin/main`, never touched it.
- **Template refinements (operator caught real gaps):**
- `Summary`**Business Use Case(s) — BDD + acceptance** (gherkin, solution-agnostic, unhappy paths; folded the standalone Acceptance field in; business-vs-product-BDD note). + `Solution notes — prior thinking (non-binding)` + the brainstorming non-canon rule. → PR **#22** (merge `f279137`).
- `Problem/pain` must state **current cost**, not "it isn't built yet"; captured the systemic fix as a Feature. + **scope-control** motivation (sprawling specs / no dev control over the autonomous build — the dev-facing headline paired with radical transparency). → PR **#23**.
- **Plugin Capture backlog.** Found plugin repo = `wiggleverse/wiggleverse-dev-claude-plugin` (reuses `triaged:accepted`; legacy feedback `type:*` colon axis is separate from capture `type/*` slash axis). Created **Epic #24** (wgl-capture) + **Feature #25** (MVP: signal-in-session → typed, source-linked issues) + **Feature #26** (capture quality — high-value tickets). Created labels `type/epic|feature`, `priority/P0|P1`.
- **Closed engineering #19** (the original dogfood seed "wgl-capture gesture + brainstorming/roadmap integration") with a comment pointing to plugin #24/#25 and noting the roadmap-integration half resolved to *removing* the roadmap.
### Wrong turns / friction (uncurated)
- Admin token lacked the issue scope → 403 on first label/issue attempts; operator re-scoped the PAT.
- First `#8` modelling was **wrong**: created it as an Epic with #15#22 as eight standalone issues. The "Feature = smallest valuable increment" principle later showed these are *slices* of one Feature, not separate issues → flagged for restructure (NOT yet done).
- Native Gitea dependency links 404 (repo dependencies setting off) → fell back to textual Blocked-by/Blocks.
- A compound bash with a heredoc + `rm -rf` was denied → split into a Write-the-script + run pattern, and avoided `rm -rf`.
- Milestone-create script aborted on a `KeyError: 'number'` (Gitea milestone has `id`, not `number`) → made milestone lookup idempotent and re-ran.
## Cut state (end of session)
**engineering** (`wiggleverse/engineering`, `main`):
- `proposals/capture-phase-and-gitea-native-flow.md` — RFC, **merged**. PR #21 (commit `f03abc4`, merge `cbf6a4f`), PR #22 (commit `ff77d92`, merge `f279137`), PR #23 (branch `proposals/scope-control-motivation`, merged). Worktrees removed; parked feature branch untouched.
- Issue **#19 closed** (pointer to plugin #24/#25).
**plugin** (`wiggleverse/wiggleverse-dev-claude-plugin`):
- **Epic #24** `type/epic`,`triaged:accepted` — wgl-capture, the Capture phase skill.
- **Feature #25** `type/feature`,`triaged:accepted`,`priority/P0` — wgl-capture MVP.
- **Feature #26** `type/feature`,`triaged:accepted`,`priority/P1` — Capture quality.
- New labels: `type/epic`(34), `type/feature`(35), `priority/P0`(36), `priority/P1`(37).
**ecomm** (`wiggleverse/wiggleverse-ecomm`): working tree **clean** (no code change). Gitea: issues **#7#14** (the asks, `priority/P0..P3`), **#8 Epic** + **#15#22** units, milestone "Admin Import MVP (#8)", labels `type/*`,`triaged:accepted`,`priority/*`. **No spec** produced.
**memory:** `capture_phase_gitea_native_flow.md` (new, with `**Next /goal:**`), `project_ecomm_build.md` (process-shift note), `MEMORY.md` index — all updated.
## What lands on the operator's plate
- **ecomm #8 + #15#22 still mis-modelled** — to be restructured into one admin-import **Feature** + slice checklist (drop the standalone unit issues). This is the next ecomm move.
- **wgl-capture is ready to build** — plugin Feature #25 is an accepted Feature; seed a **brainstorming session on the plugin repo** to spec it. #26 (quality) follows.
- **Gitea "Enable dependencies for issues"** is off on both ecomm and plugin repos — flip it in repo Settings → Issues to get native blocked-by links; provisioning should default it on (RFC §11.8).
- Implementing the **handbook §-edits** (RFC §10) and the **plugin skills** (`wgl-capture`, `wgl-triage-captures`, the bookend updates) is separate, sequenced work.
## Prompt the operator can paste into the next session
```
/goal Restructure ecomm #8 + #15#22 into the capture model — recast #8 as the admin-import Feature with a slice checklist, drop the standalone unit issues — so it's an accepted Feature ready to brainstorm into a spec. See memory: capture_phase_gitea_native_flow.md, project_ecomm_build.md.
```
(Or, to build the skill instead — a **plugin**-repo session: `/goal Brainstorm plugin Feature #25 (wgl-capture MVP) into a Solution Design spec`.)
## Deferred decisions
_None._ This was a highly collaborative session — every modelling call (taxonomy, WSJF-over-RICE, no-roadmap, slice↔plan 1-1, the 4 settled RFC decisions) was made with the operator in the loop. No autonomous low-confidence calls to surface.