5.1 KiB
5.1 KiB
Session 0016.0 — Transcript
App: ecomm Type: coding Date: 2026-06-04 (PST) · Start 01-20 · End 05-14 Goal: ship the next roadmap item (merged to
main) Outcome: R05 merged + R06online-store/preferencesbuilt and merged tomain; gate green at 189 tests.
Plan
/wgl-coding-session-init → operator: "Goal set: Next roadmap item", with the standing
rule a goal is not achieved until merged to main. Baseline was on the unmerged
r05-customers-customer-list branch (PR #4 open). Plan that emerged:
- Merge R05/PR #4 to restore a clean
mainbaseline. - Build R06
online-store/preferences(21 scenarios,09.02.0001–0021) end-to-end via the established cadence: design spec → TDD plan → execute → PR → merge.
Pre-session state
- On branch
r05-customers-customer-list, clean + pushed, 2 commits ahead oforigin/main— R05 built & green (151 tests) but not merged (PR #4 open). - Roadmap frontier: R01–R05 + R07 shipped; R06
online-store/preferencesthe next unshipped Wave-1 foundation.
Turn-by-turn arc
- Session init (0016 claimed). No other sessions in flight at claim time. Surveyed git: R05 unmerged on a feature branch. Surfaced the unclean baseline.
- Merged R05/PR #4 →
main(5fe20d9) via the Gitea API; fast-forwarded localmain, deleted the merged branch, ran the gate (151 green). Updated memory. - R06 brainstorming. Read the 21 BDD scenarios + the existing
customers/contentpatterns. Surfaced the three load-bearing design decisions viaAskUserQuestion; operator approved all as recommended:- new
online_storedomain (vs. extendingstore); - the unbuilt-dependency behaviours become tested seams now (R05
set_customer_statspattern) rather than deferred scenarios; - favicon/social image reuse the
contentfiles domain for byte storage.
- new
- Design spec written + committed (
docs/superpowers/specs/2026-06-04-r06-*-design.md, SPEC §13 lands at build time). Self-reviewed (fixed a GraphQL/REST favicon inconsistency). - Implementation plan written + committed (
docs/superpowers/plans/2026-06-04-r06-*.md) — 8 TDD tasks, concrete code per step, self-reviewed for spec coverage / placeholders / type consistency. - Executed (inline, batched). New
online_storedomain + migration0008; ICO added tocontent.ACCEPTED;online-storestaff section; REST + GraphQL wiring; one test per scenario + GraphQL parity + section gate (38 new tests). Gate green at 189 tests, layering KEPT. - Docs: SPEC §13 + §6 seam-deferral note, MAP domain/lookup rows, ROADMAP R06 → ✅,
health
releasestring →R04+R05+R06+R07. - Finished the branch: pushed
r06-online-store-preferences, opened Gitea PR #5, merged tomain(20ea29f), fast-forwarded localmain, deleted the branch. Gate green onmain. - Plugin upgrade mid-session (0.8.0 → 0.10.0); finalized via the new unified
wgl-session-finalize.
Deferred decisions / low-confidence calls
setPasswordMessagefolded intoupdate_preferences. The design spec §6 listed a dedicatedsetPasswordMessageGraphQL mutation; in implementation the password-page message (09.02.0012) is just a non-sensitive field in theupdate_preferencesPATCH, so a separate mutation was dropped as redundant. Behaviour and the scenario test are unchanged. Easy to add a dedicated mutation later if a UI wants it. (The three load-bearing design calls were operator-approved up front, not deferred.)
Cut state (end of session)
main@20ea29f— R01–R07 all merged. Gate green, 189 tests.- Cross-repo: none — all R06 work is in
wiggleverse-ecomm. - Commit trail (this session, on
main):5fe20d9merge PR #4 (R05)3660700docs(R06) design spec ·0b89de0docs(R06) pland6e4f99feat(R06) domain + GraphQL/REST + 21-scenario testsa864b14docs(R06) SPEC §13 + MAP/ROADMAP/health20ea29fmerge PR #5 (R06)
What lands on the operator's plate
- PR #6
docs/retire-ecomm-prototype(by ben.stull, mergeable) is open and not part of this session — a separate docs effort (drops the retired prototype repo from app.json/README/SPEC; companion meta PR #1). The working tree is currently checked out on that branch. Operator chose to leave it for its own session — do not disturb it. - No other outstanding items; R06 is fully shipped.
Prompt the operator can paste into the next session
The next item is a fresh roadmap pick (no in-flight resume pointer — R06 is done). Wave-1
has three small foundations left (R08/R09/R10); the Wave-2 keystone R15 orders is also
unblocked. Recommended next:
/goal Build R08 settings/brand (7 scenarios, 13.02.0001-0007), per wiggleverse-ecomm/ROADMAP.md — new foundation slice; alternatively R09 settings/plan, R10 settings/policies, or the Wave-2 keystone R15 orders (70 scenarios). First read memory project_ecomm_build.md. Note: PR #6 docs/retire-ecomm-prototype is a separate in-flight effort — leave it; start R08 from a clean main.