Files
session-history/dev-claude-plugin/0081/SESSION-0081.0-TRANSCRIPT-2026-06-26T05-59--2026-06-26T06-14.md

105 lines
5.5 KiB
Markdown
Raw Permalink Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Session 0081.0 — Transcript
> App: dev-claude-plugin
> Start: 2026-06-26T05-59 (PST)
> End: 2026-06-26T06-14 (PST)
> Type: writing-plans
> Posture: careful
> Claude-Session: 920d1491-74bd-4b30-b64a-39a0fc29f1f2
> Checkout: /Users/benstull/git/wiggleverse.org/wiggleverse/wiggleverse-dev-claude-plugin
> Status: **FINALIZED**
## Launch prompt
```
Update the plugin so sessions are not started (and don't need finalizing) unless the pwd is under ~/git/wiggleverse.org
```
## Outcome
A **writing-plans** session: produced and archived **one reviewed implementation plan**;
did **not** execute it (the build track's terminal review gate). A separate
`wgl-executing-plans` session will build it.
- **Plan:** `docs/superpowers/plans/2026-06-26-gate-session-on-pwd-under-wgl-root.md`
(plugin repo), archived to content `plans/2026-06-26-gate-session-on-pwd-under-wgl-root.md`
(`6c9e183`).
- **PR #136** (`session-0081``main`) merged, merge `6715015`, plan commit `7014f6b`;
branch deleted.
- **No version change** this session (the bump to 0.61.0 happens during execution); loaded
pin 0.60.0 == origin/main → no make-live step.
## Pre-state
- On `main`, clean (one untracked, pre-existing stray: `docs/superpowers/specs/2026-06-09-wgl-capture-mvp-design.pdf` — left untouched), synced with origin.
- Not a git worktree. 6 stale `--INPROGRESS` placeholders at claim
(0035/0048/0058/0065/0068/0076) — none judged live; no isolation needed.
- Loaded plugin pin: 0.60.0.
## Arc (turn by turn)
1. **Session gate / classification.** Opened in the plugin repo (under
`~/git/wiggleverse.org`), so a tracked session is appropriate. The request — change
the plugin's own session-start/finalize behavior — is a build task with interpretation
latitude, so asked the operator (AskUserQuestion) how to scope it: **brainstorming /
writing-plans-leaf / capture**. Operator chose **writing-plans (leaf task)**.
2. **Init (Steps 17).** Start time `2026-06-26T05-59` (PST). Dry-run peek → next free ID
0081. Baseline clean/pushed `main`, not a worktree. Claimed
`claim-session-id.sh --type writing-plans`**0081**, stamped `> Posture: careful` (the
per-type default). Recorded the anchor in the placeholder's `## Plan` block (leaf task,
no Gitea issue filed — anchored on the launch prompt, R2b).
3. **Orientation / grounding the design.** Read the actual hooks before planning
(feedback memory: ground design forks in real artifacts):
- `hooks/session-start` **injects `session-gate.md` unconditionally** — no pwd/app
check. This is THE thing to gate.
- `hooks/finalize-on-goal` (Stop) and `hooks/session-end-finalize-guard` (SessionEnd)
already resolve the app and require a local `--INPROGRESS` placeholder (which only
exists if a session was claimed) → they no-op transitively once the gate doesn't fire.
- Reused patterns: `hooks/worktree-edit-guard.py`'s `under()` containment rule; the
`ohm-presence-notice` precedent for `$HOME/git/wiggleverse.org` + an env override; the
`skills/*/scripts/test-*.sh` offline test idiom.
4. **Wrote the plan** (`superpowers:writing-plans`): 4 Tasks — (T1) new deterministic
`hooks/under-session-root.sh` classifier + offline test; (T2) wire it into
`hooks/session-start` (suppress gate only on a confident `outside`) + end-to-end hook
test; (T3) the same guard in both finalize hooks; (T4) CLAUDE.md docs + version bump
0.60.0→0.61.0 + `lint.sh --check-bump`. Committed on branch `session-0081`, pushed,
presented the rendered Gitea URL at the review gate with the two design forks called
out.
5. **Gate passed.** Operator: "approved".
6. **Finalize (writing-plans arm).** Created + merged PR #136 via the Gitea API
(`gitea-api.sh`; `gh` is GitHub-only here), synced `main`, deleted the branch. Archived
the plan to the content repo `plans/` via `submit-plan.sh`. No §9 (nothing executed). No
make-live (no version gap). Updated memory. Published this transcript.
## Key decisions
- **Path-literal, not app.json.** Gate on the *path* `~/git/wiggleverse.org` (the
operator's exact words, env-overridable via `WGL_SESSION_ROOT`), not on app-resolution —
because non-app wgl repos (engineering, ohm-content) must still get the gate.
Confirmed with the operator at the gate.
- **Asymmetric fail-safe.** The classifier returns `under`/`outside`/`unknown`; every
consumer suppresses the session machinery **only** on a confident `outside`. On `unknown`
(no jq, unreadable cwd, unresolvable root) it keeps today's behavior — a false `outside`
(dropping the gate in a real repo) is strictly worse than a false `under` (gating a
non-wgl repo, which just routes to `wgl-session-none`, the status quo).
- **Finalize-hook guards are explicit-but-redundant.** Outside the root nothing is claimed,
so no placeholder exists and the finalize hooks already no-op; T3 makes the rule explicit
and uniform, honoring the request's "(and don't need finalizing)" clause. Flagged as
droppable if the operator wanted the change minimal.
## Deferred decisions
- **No Gitea issue filed** for this leaf task (operator chose writing-plans/leaf at the
gate); anchored on the launch prompt. An issue could be filed retroactively if a tracker
record is wanted.
## Next session
```
/goal Execute the pwd-gating plan: wgl-executing-plans against content plans/2026-06-26-gate-session-on-pwd-under-wgl-root.md
```
Builds `hooks/under-session-root.sh` + wires `hooks/session-start` and the two finalize
hooks; CLAUDE.md docs; version bump 0.60.0→0.61.0; `lint.sh --check-bump`; make the
shipped pin live at finalize.