Files
session-history/dev-claude-plugin/0074/SESSION-0074.0-TRANSCRIPT-2026-06-12T01-58--2026-06-12T02-16.md

8.3 KiB

Session 0074.0 — Transcript

App: dev-claude-plugin Start: 2026-06-12T01-58 (PST) End: 2026-06-12T02-16 (PST) Type: planning-and-executing Posture: yolo Claude-Session: fc5fad4e-e4fd-4d70-8e87-c3a738838ea9 Status: FINALIZED

Launch prompt

/goal plan-and-execute SLICE-5 — the final slice of the design-handoff spec.

Plan

Anchor: design wiggleverse-dev-claude-plugin-content/specs/2026-06-11-design-handoff-design.md (graduated v1.0.0, R2a — ELIGIBLE)

SLICE-5 — Planning-and-executing orientation awareness (completes PUC-2, PUC-2a, PP-1; depends on SLICE-1 ✓, SLICE-3 ✓).

DoD (spec §7.2): wgl-planning-and-executing orientation reads the anchor issue **Designs:** line + the spec slice **Design:** field, surfaces the design path, and warns when a UX slice's design is pending/absent (soft gate; #99 owns the hard block); doc (DOC-3) + version bump.

Tasks (§4.2 deterministic-tool + thin skill seam):

  1. backfill-spec-design.sh get-field --slice ID — pure read counterpart of set-field (reuses the slice-scoping parser).
  2. gitea-api.sh read-body-line --label L — pure read counterpart of upsert-body-line (extract value after a labelled body line).
  3. NEW skills/wgl-planning-and-executing/scripts/design-readiness.sh — orientation verb: reads spec field + issue **Designs:** line, classifies READY/PENDING/MISSING, prints verdict + warning, exit 0 (soft).
  4. NEW test-design-readiness.sh — offline tests (get-field, read-body-line, classification: READY surfaces path / PENDING warns / MISSING warns).
  5. DOC-3 — SKILL.md Step 8.6 (soft design-readiness gate) after the §8.5 eligibility gate.
  6. CLAUDE.md design-handoff bullet — mark SLICE-5 shipped (flow complete).
  7. plugin.json 0.55.0 → 0.56.0; scripts/lint.sh --check-bump green.

Pre-state

  • Plugin repo on main, clean, synced with origin/main (only a stray untracked docs/superpowers/specs/2026-06-09-wgl-capture-mvp-design.pdf, pre-existing, left untouched). Latest ship 0.55.0 (SLICE-4, session 0073).
  • Session loaded plugin v0.52.0 (cache lag — flagged by the cache-lag-notice SessionStart hook; shipped was 0.55.0).
  • The design-handoff spec was complete through SLICE-4; SLICE-5 (the consuming-side orientation awareness) was the only slice left.
  • Five --INPROGRESS placeholders in flight at claim (0035/0048/0058/0068 stale orphans; 0065 the live concurrent content-repo #102 brainstorm — a different checkout). No live concurrent session contends for the plugin checkout.

Arc (turn-by-turn)

  1. Session gate → init. Classified /goal plan-and-execute SLICE-5 as planning-and-executing (≥90%); invoked wgl-planning-and-executing. Computed start time (PST), peeked at in-flight sessions (dry-run), claimed session 0074 (posture: yolo, stamped). Verified clean main baseline + the @~/.claude/wiggleverse.md stub present.
  2. Orientation. Located the design-handoff spec in the content repo; read it from origin/main (content checkout was on the concurrent 0065's branch — not disturbed). Pinned SLICE-5's DoD (§7.2), the PUC-2/2a implementation note (§6.5), and DOC-3's target (wgl-planning-and-executing SKILL.md).
  3. Eligibility gate (§8.5). check-issue-eligibility.sh --for implementation-plan --design <spec> → ELIGIBLE (R2a, graduated Solution Design). Recorded the anchor in the transcript plan block.
  4. Design decision. Read the existing SLICE-3/4 writers (backfill-spec-design.sh set-field, gitea-api.sh upsert-body-line/issue-body-upsert, link-design-issue.sh). Decided per §4.2 to build the orientation check as a tested deterministic verb (not prose), as the read inverses of those writers so the labelled-line parsing stays in one place per convention.
  5. Worktree. Isolated on worktree-session-0074-design-handoff-slice5 (optional here — no live plugin-checkout concurrency — but a branch was needed for the PR anyway).
  6. Implement (TDD).
    • backfill-spec-design.sh: added pure get-field --slice ID (dispatch → {set-field|get-field}; one python program switches on a mode argv, regex group2 = the value). Smoke-tested (token-scoping SLICE-4≠SLICE-40 intact, set-field unchanged).
    • gitea-api.sh: added pure read_body_line helper + read-body-line --label L subcommand (read inverse of upsert_body). Smoke-tested the **Designs:** vs singular **Design:** asymmetry and mid-prose immunity.
    • NEW design-readiness.sh: combines the two readers (spec field via get-field, issue pointer via read-body-line over a --issue-body-file or live --repo/--issue GET→jq .body), classifies READY / PENDING / MISSING / NO-UI, prints a verdict token + human line, always exit 0.
    • NEW test-design-readiness.sh (hermetic/offline): groups A (get-field), B (read-body-line), C (the four verdicts + issue-overrides-pending + soft-gate exit-0 + usage errors). 19/19 green.
  7. Regression. Existing design-handoff suites green (19 + 17 + 10) after the backfill/gitea-api edits.
  8. Docs + bump. DOC-3: SKILL.md new Step 8.6 (soft design-readiness gate after §8.5). CLAUDE.md design-handoff bullet → records the now-end-to-end flow. plugin.json 0.55.0 → 0.56.0. scripts/lint.sh --check-bump clean (shellcheck skipped — not installed).
    • The worktree-edit-guard hook correctly caught an accidental edit aimed at the canonical CLAUDE.md; redirected to the worktree copy.
  9. Ship. Commit e66bd2d; pushed branch; PR #123 (mergeable) via Gitea API; merged (merge 2665d22). Local main ff-synced to 0.56.0.
  10. Finalize. Worktree torn down post-merge (ExitWorktree flagged the merged commit as local-unmerged since local main lagged the remote merge — discarded safely, content verified present in origin/main). Plugin pin made live 0.52.0→0.56.0 via update-plugin.sh (enabled pin 0.55.0→0.56.0; restart//clear to load). Memory + transcript updated.

Cut state

  • Plugin 0.56.0 merged to main (PR #123); pin made live for new sessions.
  • The design-handoff flow is COMPLETE end-to-end (SLICE-1 central field 0070 → home 0071 → link 0072 → orchestration+backfill+#99 0073 → orientation awareness 0074). PUC-2 / PUC-2a / PP-1 delivered.
  • Tests: 19 new + 46 existing (65 total) green; lint clean (shellcheck skipped).
  • No plan artifact archived (planned in-transcript; the slice was fully specified by the reviewed Solution Design — submit-plan correctly skipped).
  • §9 pipeline: no deployable UI app for this plugin change → no PPE/prod stage; done at merge + version bump + green.

Operator plate (open threads — operator picks next)

  • The design-handoff flow is done — no next slice.
  • #93 still OPEN — operator call: drop the stale #98 → #93 blocked-by edge and close #93 (Gitea 412'd the auto-close at SLICE-4 because #98 is still open; the #93 deliverable is shipped via SLICE-1 + SLICE-4).
  • #102 (Phase-2 server-side type-validation net) is being designed by the concurrent 0065 session (content branch session-0065). Implementing it is the natural next coding session once that design graduates.
  • Plugin feedback: 4 open / 0 untriaged — /goal feedback when there's something to triage.

Deferred decisions

  • shellcheck not run locally (recurring): brew install shellcheck is sandbox-blocked, so scripts/lint.sh skipped the shellcheck baseline for the new design-readiness.sh / test-design-readiness.sh and the edited backfill-spec-design.sh / gitea-api.sh. Mitigated: bash -n clean on all four, and the scripts mirror the existing (shellcheck-passing) house patterns.
  • SLICE-5 built a deterministic verb (design-readiness.sh) + tests, where the spec DoD literally said "doc + version bump". Judged the §4.2 deterministic-tooling-over-prose rule + §12's "orientation warn-on-pending" test to mandate a tested verb (matching the SLICE-2/3/4 family), not prose-only. Low risk; flagging the interpretation.

Next session prompt

The design-handoff flow is complete — there is no queued slice. The operator picks the next item: close out #93 (drop the stale #98 dependency), pick up #102 once 0065's design graduates, or process plugin feedback. No /goal next slice is parked.