update dev-claude-plugin/0070/SESSION-0070.0-TRANSCRIPT-2026-06-11T23-48--INPROGRESS.md

This commit is contained in:
2026-06-12 00:05:45 -07:00
parent 3ff2f7fe26
commit 859fefc44e
@@ -5,18 +5,113 @@
> Type: planning-and-executing
> Posture: yolo
> Claude-Session: 1e0caa5d-2b15-4218-946a-0ac83195d926
> Status: **PLACEHOLDER — claimed at session start; finalized at session end.**
>
> This file reserves session ID 0070 for dev-claude-plugin. The driver replaces this
> body with the full transcript and renames the file to its final
> SESSION-0070.0-TRANSCRIPT-2026-06-11T23-48--<end>.md form at session end.
> Status: **FINALIZED.**
> Outcome: graduated the design-handoff Solution Design (v1.0.0) and shipped
> SLICE-1 (the central-docs `**Design:**` field convention, engineering PR #57).
## Launch prompt
_(launch prompt not captured at claim time)_
`/goal next` → resolved from memory to: **graduate + plan-and-execute the
design-handoff spec** (SLICE-1 first; needs graduation/R2a).
## Plan
> Anchor: design `specs/2026-06-11-design-handoff-design.md` (content repo) —
> anchors wiggleverse-dev-claude-plugin#95 (primary) + #93 (co-anchor).
Resume of session 0069's design (`wgl-design-handoff`). This session:
1. **Graduate** the spec — operator's recorded `/goal next` intent says
"graduate"; 0069 submitted it `proposed`. Stamp `status:graduated`
(frontmatter + in-doc Status cell), v0.1.0→v1.0.0, changelog row, re-submit
via `submit-spec.sh`. Confirm R2a eligibility.
2. **Write the JIT plan** (all 5 slices; execution focus SLICE-1).
3. **Execute SLICE-1** — the central engineering GUIDE/TEMPLATE per-UX-slice
`**Design:**` convention (doc-first; #93 doc half). Then continue into the
plugin slices (2→5) as the session allows.
Concurrency: live concurrent sessions 0065 (content repo on its branch) + 0068
at claim; 0035/0048/0058 are long-stale placeholders. SLICE-1 mutates the
**engineering** repo and graduation pushes to **content** via submit-spec's own
clone → isolate in worktrees per §5.4.
## Deferred decisions
## Progress
**Graduated the design-handoff Solution Design (R2a).** Per the operator's
recorded `/goal next` intent ("graduate + plan-and-execute"), stamped
`status:graduated` (frontmatter + in-doc Status cell), bumped v0.1.0→v1.0.0, and
added a changelog row, re-submitting via `submit-spec.sh` to content `main`. The
eligibility gate confirms `ELIGIBLE … (R2a)`. **Gotcha:** the first `submit-spec.sh`
run defaulted `--name` to my temp source basename, creating a stray duplicate
`specs/design-handoff-spec.md` alongside the canonical
`specs/2026-06-11-design-handoff-design.md`. Fixed: re-ran with the correct
`--name`, then removed the duplicate via content **PR #5** (squash-merged).
**Wrote the SLICE-1 JIT plan**
`docs/superpowers/plans/2026-06-11-design-handoff-slice-1.md`. Per the engineering
GUIDE §7.1 one-slice-one-session convention, the plan covers SLICE-1 only; the
SLICE-2→5 roadmap is carried from the spec for context (each its own future JIT
session).
**Shipped SLICE-1** — the per-UX-slice `**Design:**` field convention in the
central engineering docs (`solution-design/GUIDE.md` §7.2 + `TEMPLATE.md`), value
`pending` | path under `*-content/ui/designs/<issue#>-<slug>/` | `N/A — no UI
surface`; `claude-design-vs-code.md` untouched. Engineering **PR #57**
(squash-merged); convention verified live on engineering `origin/main`. Ran in an
isolated engineering worktree (`session-0070-design-field`), torn down post-merge,
branch deleted. This completes the **#93 doc half** (the backfill half lands in
SLICE-4 — #93 stays open).
**Next:** SLICE-2 (storage + unpack/normalize + commit → PUC-1 home step) — plugin
repo, its own JIT session.
## Deferred decisions
_Autonomous-mode low-confidence calls the driver made and would have
liked operator input on. Appended as the session runs; surfaced at
finalize. Empty if none._
finalize._
- **Graduated the spec on the strength of the recorded `/goal next` intent.**
Session 0069 deliberately submitted it `proposed` (not graduated); the operator
did not re-confirm graduation live this session. Treated the recorded next-goal
("graduate …") as the operator's instruction. Reversible (re-submit `proposed`).
- **Plan-history copy archived to content `plans/` only (canonical), no standalone
plugin-repo PR.** SLICE-1 touched only the `engineering` repo, so there was no
plugin PR to carry the plan-history copy; spinning a standalone plugin PR purely
for a secondary copy was judged unwarranted ceremony mid-concurrency. The
canonical archive (content `plans/`) is written at finalize.
- **No plugin-repo worktree.** Confirmed-live concurrent same-app session 0065 is
in the **content** repo (on its own branch), not the plugin checkout; 0035/0048/
0058 are long-stale; 0068's status unknown but the plugin checkout was clean on
`main`. SLICE-1's mutations were isolated in an **engineering** worktree; no
substantive plugin-checkout writes were made. Judged low-contention (precedent:
sessions 0051/0062).
## Session arc (turn-by-turn)
1. Opened with `/goal next`; the session gate resolved the stored `Next /goal:`
from memory → "graduate + plan-and-execute the design-handoff spec (SLICE-1
first)"; classified planning-and-executing → `wgl-planning-and-executing`.
2. Claimed session **0070** (posture yolo). Peek showed in-flight 0035/0048/0058
(stale) + 0065 (live, content repo) + 0068 (unknown). Baseline clean on
`main`@0.52.0.
3. Read the spec; confirmed R2a only requires the design file to exist; graduated
the spec via `submit-spec.sh` (the `--name` gotcha + content PR #5 cleanup).
4. Wrote the SLICE-1 JIT plan (one-slice-one-session per GUIDE §7.1).
5. Executed SLICE-1 in an isolated engineering worktree: GUIDE §7.2 + TEMPLATE.md
`**Design:**` field → engineering PR #57 (squash-merged); verified live;
worktree torn down.
6. Finalize: archived the plan to content `plans/`; no plugin bump / no version
gap → make-live skipped; commented progress on #95; updated memory + Next
/goal → SLICE-2; published this transcript.
## Cut state / next session
- **Landed:** design-handoff spec graduated (content `main`); SLICE-1 live on
engineering `origin/main`; plan archived to content `plans/`.
- **Open:** #95/#93 remain open (the flow is not fully built); #93's backfill half
is SLICE-4. Remaining slices 2→5 are in the graduated spec §7.2.
- **Next move:** `/goal next` resolves to SLICE-2 (storage + unpack/normalize +
commit → home step; plugin repo; depends on SLICE-1 ✓).