diff --git a/dev-claude-plugin/0070/SESSION-0070.0-TRANSCRIPT-2026-06-11T23-48--INPROGRESS.md b/dev-claude-plugin/0070/SESSION-0070.0-TRANSCRIPT-2026-06-11T23-48--INPROGRESS.md index 53fc3c0..0f8e52e 100644 --- a/dev-claude-plugin/0070/SESSION-0070.0-TRANSCRIPT-2026-06-11T23-48--INPROGRESS.md +++ b/dev-claude-plugin/0070/SESSION-0070.0-TRANSCRIPT-2026-06-11T23-48--INPROGRESS.md @@ -5,18 +5,113 @@ > Type: planning-and-executing > Posture: yolo > Claude-Session: 1e0caa5d-2b15-4218-946a-0ac83195d926 -> Status: **PLACEHOLDER — claimed at session start; finalized at session end.** -> -> This file reserves session ID 0070 for dev-claude-plugin. The driver replaces this -> body with the full transcript and renames the file to its final -> SESSION-0070.0-TRANSCRIPT-2026-06-11T23-48--.md form at session end. +> Status: **FINALIZED.** +> Outcome: graduated the design-handoff Solution Design (v1.0.0) and shipped +> SLICE-1 (the central-docs `**Design:**` field convention, engineering PR #57). ## Launch prompt -_(launch prompt not captured at claim time)_ +`/goal next` → resolved from memory to: **graduate + plan-and-execute the +design-handoff spec** (SLICE-1 first; needs graduation/R2a). + +## Plan + +> Anchor: design `specs/2026-06-11-design-handoff-design.md` (content repo) — +> anchors wiggleverse-dev-claude-plugin#95 (primary) + #93 (co-anchor). + +Resume of session 0069's design (`wgl-design-handoff`). This session: + +1. **Graduate** the spec — operator's recorded `/goal next` intent says + "graduate"; 0069 submitted it `proposed`. Stamp `status:graduated` + (frontmatter + in-doc Status cell), v0.1.0→v1.0.0, changelog row, re-submit + via `submit-spec.sh`. Confirm R2a eligibility. +2. **Write the JIT plan** (all 5 slices; execution focus SLICE-1). +3. **Execute SLICE-1** — the central engineering GUIDE/TEMPLATE per-UX-slice + `**Design:**` convention (doc-first; #93 doc half). Then continue into the + plugin slices (2→5) as the session allows. + +Concurrency: live concurrent sessions 0065 (content repo on its branch) + 0068 +at claim; 0035/0048/0058 are long-stale placeholders. SLICE-1 mutates the +**engineering** repo and graduation pushes to **content** via submit-spec's own +clone → isolate in worktrees per §5.4. + +## Deferred decisions + +## Progress + +**Graduated the design-handoff Solution Design (R2a).** Per the operator's +recorded `/goal next` intent ("graduate + plan-and-execute"), stamped +`status:graduated` (frontmatter + in-doc Status cell), bumped v0.1.0→v1.0.0, and +added a changelog row, re-submitting via `submit-spec.sh` to content `main`. The +eligibility gate confirms `ELIGIBLE … (R2a)`. **Gotcha:** the first `submit-spec.sh` +run defaulted `--name` to my temp source basename, creating a stray duplicate +`specs/design-handoff-spec.md` alongside the canonical +`specs/2026-06-11-design-handoff-design.md`. Fixed: re-ran with the correct +`--name`, then removed the duplicate via content **PR #5** (squash-merged). + +**Wrote the SLICE-1 JIT plan** — +`docs/superpowers/plans/2026-06-11-design-handoff-slice-1.md`. Per the engineering +GUIDE §7.1 one-slice-one-session convention, the plan covers SLICE-1 only; the +SLICE-2→5 roadmap is carried from the spec for context (each its own future JIT +session). + +**Shipped SLICE-1** — the per-UX-slice `**Design:**` field convention in the +central engineering docs (`solution-design/GUIDE.md` §7.2 + `TEMPLATE.md`), value +`pending` | path under `*-content/ui/designs/-/` | `N/A — no UI +surface`; `claude-design-vs-code.md` untouched. Engineering **PR #57** +(squash-merged); convention verified live on engineering `origin/main`. Ran in an +isolated engineering worktree (`session-0070-design-field`), torn down post-merge, +branch deleted. This completes the **#93 doc half** (the backfill half lands in +SLICE-4 — #93 stays open). + +**Next:** SLICE-2 (storage + unpack/normalize + commit → PUC-1 home step) — plugin +repo, its own JIT session. ## Deferred decisions _Autonomous-mode low-confidence calls the driver made and would have liked operator input on. Appended as the session runs; surfaced at -finalize. Empty if none._ +finalize._ + +- **Graduated the spec on the strength of the recorded `/goal next` intent.** + Session 0069 deliberately submitted it `proposed` (not graduated); the operator + did not re-confirm graduation live this session. Treated the recorded next-goal + ("graduate …") as the operator's instruction. Reversible (re-submit `proposed`). +- **Plan-history copy archived to content `plans/` only (canonical), no standalone + plugin-repo PR.** SLICE-1 touched only the `engineering` repo, so there was no + plugin PR to carry the plan-history copy; spinning a standalone plugin PR purely + for a secondary copy was judged unwarranted ceremony mid-concurrency. The + canonical archive (content `plans/`) is written at finalize. +- **No plugin-repo worktree.** Confirmed-live concurrent same-app session 0065 is + in the **content** repo (on its own branch), not the plugin checkout; 0035/0048/ + 0058 are long-stale; 0068's status unknown but the plugin checkout was clean on + `main`. SLICE-1's mutations were isolated in an **engineering** worktree; no + substantive plugin-checkout writes were made. Judged low-contention (precedent: + sessions 0051/0062). + +## Session arc (turn-by-turn) + +1. Opened with `/goal next`; the session gate resolved the stored `Next /goal:` + from memory → "graduate + plan-and-execute the design-handoff spec (SLICE-1 + first)"; classified planning-and-executing → `wgl-planning-and-executing`. +2. Claimed session **0070** (posture yolo). Peek showed in-flight 0035/0048/0058 + (stale) + 0065 (live, content repo) + 0068 (unknown). Baseline clean on + `main`@0.52.0. +3. Read the spec; confirmed R2a only requires the design file to exist; graduated + the spec via `submit-spec.sh` (the `--name` gotcha + content PR #5 cleanup). +4. Wrote the SLICE-1 JIT plan (one-slice-one-session per GUIDE §7.1). +5. Executed SLICE-1 in an isolated engineering worktree: GUIDE §7.2 + TEMPLATE.md + `**Design:**` field → engineering PR #57 (squash-merged); verified live; + worktree torn down. +6. Finalize: archived the plan to content `plans/`; no plugin bump / no version + gap → make-live skipped; commented progress on #95; updated memory + Next + /goal → SLICE-2; published this transcript. + +## Cut state / next session + +- **Landed:** design-handoff spec graduated (content `main`); SLICE-1 live on + engineering `origin/main`; plan archived to content `plans/`. +- **Open:** #95/#93 remain open (the flow is not fully built); #93's backfill half + is SLICE-4. Remaining slices 2→5 are in the graduated spec §7.2. +- **Next move:** `/goal next` resolves to SLICE-2 (storage + unpack/normalize + + commit → home step; plugin repo; depends on SLICE-1 ✓).