2.9 KiB
2.9 KiB
Session 0011.0 — Transcript
App: wiggleverse-www Start: 2026-06-11T08-10 (PST) End: 2026-06-11T08-20 (PST) Type: planning-and-executing Claude-Session: 75ed8255-3a55-4049-b438-f3e571918074 Status: FINALIZED
Launch prompt
Find the right scoped token in a secret and use it instead of the OHM bot's
Plan
Anchor: direct operator instruction (least-privilege follow-up to session 0010's deferred token-choice decision) — treated as a leaf
task.
Replace the org-owner-grade token in wgl-www-finances-git-token with a
narrower one found in an existing secret; if none exists, propose the
least-privilege alternative.
Pre-state
- Session 0010 left
wgl-www-finances-git-tokenv1 = a copy ofohm-rfc-app-gitea-bot-token, flagged in its deferred decisions as broader than the job needs.
Arc
- Claimed session 0011.
- Audited every token-shaped secret across the org's GCP projects (wiggleverse-ohm, wiggleverse, wiggleverse-ecomm, wiggle-snip, rfc-app-ppe, wiggleverse-ecomm-bdd-app). Probes kept bytes in-process; scope was read from the API's scope-error messages, never from the token itself.
- Findings: no narrowly-scoped write token exists anywhere.
ohm-rfc-app-gitea-bot-tokenandplanner-planner-gitea-token: different bytes, bothwrite:repository, both org-owner-grade — admin/push onwiggleverse-org/corp,wiggleverse/session-history,wiggleverse/ohm-content,wiggleverse/engineering, and www.*-gitea-read-token×4: read-only, cannot push.wgl-gitea-issue-token:write:issueonly.planner-planner-token: not a valid Gitea credential.
- Proposed the least-privilege path (dedicated
finances-botuser → write collaborator on only wiggleverse-www → token minted on it → secret v2 → verify → destroy v1) and handed the operator the stdin command. - Operator decision: DECLINED the bot — keep the current token ("tokens are gitea-wide; the write-repo token you have is as good as it gets"). Noted: a dedicated bot user would effectively repo-scope it (the user's access is the boundary), but the decision stands and is recorded in memory — don't re-raise unless asked.
Cut state
- No code, config, or cloud changes this session — audit + decision only.
wgl-www-finances-git-tokenstays at v1 (the OHM org-owner token); the Cloud Run job is unchanged and verified from session 0010.main=3523623, clean; no open PRs.
Deferred decisions
- None — the one open call (token breadth) was decided explicitly by the operator this session.
Operator plate
- Unchanged from 0010: issue #11 (~Aug 1 activation), issue #9 (IRS letter).
Next-session prompt
/goal Work issue #7 — reframe the home "Builder" router card and the partner-page "developer" teasers to match the Give pitch (hands-on, business- and product-minded software architects, fully agentic spec-driven shop)