8.3 KiB
Session 0074.0 — Transcript
App: dev-claude-plugin Start: 2026-06-12T01-58 (PST) End: 2026-06-12T02-16 (PST) Type: planning-and-executing Posture: yolo Claude-Session: fc5fad4e-e4fd-4d70-8e87-c3a738838ea9 Status: FINALIZED
Launch prompt
/goal plan-and-execute SLICE-5 — the final slice of the design-handoff spec.
Plan
Anchor: design
wiggleverse-dev-claude-plugin-content/specs/2026-06-11-design-handoff-design.md(graduated v1.0.0, R2a — ELIGIBLE)
SLICE-5 — Planning-and-executing orientation awareness (completes PUC-2, PUC-2a, PP-1; depends on SLICE-1 ✓, SLICE-3 ✓).
DoD (spec §7.2): wgl-planning-and-executing orientation reads the anchor issue
**Designs:** line + the spec slice **Design:** field, surfaces the design
path, and warns when a UX slice's design is pending/absent (soft gate; #99
owns the hard block); doc (DOC-3) + version bump.
Tasks (§4.2 deterministic-tool + thin skill seam):
backfill-spec-design.sh get-field --slice ID— pure read counterpart ofset-field(reuses the slice-scoping parser).gitea-api.sh read-body-line --label L— pure read counterpart ofupsert-body-line(extract value after a labelled body line).- NEW
skills/wgl-planning-and-executing/scripts/design-readiness.sh— orientation verb: reads spec field + issue**Designs:**line, classifies READY/PENDING/MISSING, prints verdict + warning, exit 0 (soft). - NEW
test-design-readiness.sh— offline tests (get-field, read-body-line, classification: READY surfaces path / PENDING warns / MISSING warns). - DOC-3 — SKILL.md Step 8.6 (soft design-readiness gate) after the §8.5 eligibility gate.
- CLAUDE.md design-handoff bullet — mark SLICE-5 shipped (flow complete).
plugin.json0.55.0 → 0.56.0;scripts/lint.sh --check-bumpgreen.
Pre-state
- Plugin repo on
main, clean, synced withorigin/main(only a stray untrackeddocs/superpowers/specs/2026-06-09-wgl-capture-mvp-design.pdf, pre-existing, left untouched). Latest ship 0.55.0 (SLICE-4, session 0073). - Session loaded plugin v0.52.0 (cache lag — flagged by the
cache-lag-noticeSessionStart hook; shipped was 0.55.0). - The design-handoff spec was complete through SLICE-4; SLICE-5 (the consuming-side orientation awareness) was the only slice left.
- Five
--INPROGRESSplaceholders in flight at claim (0035/0048/0058/0068 stale orphans; 0065 the live concurrent content-repo #102 brainstorm — a different checkout). No live concurrent session contends for the plugin checkout.
Arc (turn-by-turn)
- Session gate → init. Classified
/goal plan-and-execute SLICE-5as planning-and-executing (≥90%); invokedwgl-planning-and-executing. Computed start time (PST), peeked at in-flight sessions (dry-run), claimed session 0074 (posture: yolo, stamped). Verified cleanmainbaseline + the@~/.claude/wiggleverse.mdstub present. - Orientation. Located the design-handoff spec in the content repo; read it
from
origin/main(content checkout was on the concurrent 0065's branch — not disturbed). Pinned SLICE-5's DoD (§7.2), the PUC-2/2a implementation note (§6.5), and DOC-3's target (wgl-planning-and-executingSKILL.md). - Eligibility gate (§8.5).
check-issue-eligibility.sh --for implementation-plan --design <spec>→ ELIGIBLE (R2a, graduated Solution Design). Recorded the anchor in the transcript plan block. - Design decision. Read the existing SLICE-3/4 writers (
backfill-spec-design.sh set-field,gitea-api.sh upsert-body-line/issue-body-upsert,link-design-issue.sh). Decided per §4.2 to build the orientation check as a tested deterministic verb (not prose), as the read inverses of those writers so the labelled-line parsing stays in one place per convention. - Worktree. Isolated on
worktree-session-0074-design-handoff-slice5(optional here — no live plugin-checkout concurrency — but a branch was needed for the PR anyway). - Implement (TDD).
backfill-spec-design.sh: added pureget-field --slice ID(dispatch →{set-field|get-field}; one python program switches on amodeargv, regex group2 = the value). Smoke-tested (token-scoping SLICE-4≠SLICE-40 intact, set-field unchanged).gitea-api.sh: added pureread_body_linehelper +read-body-line --label Lsubcommand (read inverse ofupsert_body). Smoke-tested the**Designs:**vs singular**Design:**asymmetry and mid-prose immunity.- NEW
design-readiness.sh: combines the two readers (spec field via get-field, issue pointer via read-body-line over a--issue-body-fileor live--repo/--issueGET→jq .body), classifies READY / PENDING / MISSING / NO-UI, prints a verdict token + human line, always exit 0. - NEW
test-design-readiness.sh(hermetic/offline): groups A (get-field), B (read-body-line), C (the four verdicts + issue-overrides-pending + soft-gate exit-0 + usage errors). 19/19 green.
- Regression. Existing design-handoff suites green (19 + 17 + 10) after the
backfill/gitea-apiedits. - Docs + bump. DOC-3: SKILL.md new Step 8.6 (soft design-readiness gate
after §8.5). CLAUDE.md design-handoff bullet → records the now-end-to-end flow.
plugin.json0.55.0 → 0.56.0.scripts/lint.sh --check-bumpclean (shellcheck skipped — not installed).- The
worktree-edit-guardhook correctly caught an accidental edit aimed at the canonicalCLAUDE.md; redirected to the worktree copy.
- The
- Ship. Commit
e66bd2d; pushed branch; PR #123 (mergeable) via Gitea API; merged (merge2665d22). Localmainff-synced to 0.56.0. - Finalize. Worktree torn down post-merge (ExitWorktree flagged the merged
commit as local-unmerged since local
mainlagged the remote merge — discarded safely, content verified present in origin/main). Plugin pin made live 0.52.0→0.56.0 viaupdate-plugin.sh(enabled pin 0.55.0→0.56.0; restart//clearto load). Memory + transcript updated.
Cut state
- Plugin 0.56.0 merged to
main(PR #123); pin made live for new sessions. - The design-handoff flow is COMPLETE end-to-end (SLICE-1 central field 0070 → home 0071 → link 0072 → orchestration+backfill+#99 0073 → orientation awareness 0074). PUC-2 / PUC-2a / PP-1 delivered.
- Tests: 19 new + 46 existing (65 total) green; lint clean (shellcheck skipped).
- No plan artifact archived (planned in-transcript; the slice was fully specified
by the reviewed Solution Design —
submit-plancorrectly skipped). - §9 pipeline: no deployable UI app for this plugin change → no PPE/prod stage; done at merge + version bump + green.
Operator plate (open threads — operator picks next)
- The design-handoff flow is done — no next slice.
- #93 still OPEN — operator call: drop the stale
#98 → #93blocked-by edge and close #93 (Gitea 412'd the auto-close at SLICE-4 because #98 is still open; the #93 deliverable is shipped via SLICE-1 + SLICE-4). - #102 (Phase-2 server-side type-validation net) is being designed by the
concurrent 0065 session (content branch
session-0065). Implementing it is the natural next coding session once that design graduates. - Plugin feedback: 4 open / 0 untriaged —
/goal feedbackwhen there's something to triage.
Deferred decisions
- shellcheck not run locally (recurring):
brew install shellcheckis sandbox-blocked, soscripts/lint.shskipped the shellcheck baseline for the newdesign-readiness.sh/test-design-readiness.shand the editedbackfill-spec-design.sh/gitea-api.sh. Mitigated:bash -nclean on all four, and the scripts mirror the existing (shellcheck-passing) house patterns. - SLICE-5 built a deterministic verb (
design-readiness.sh) + tests, where the spec DoD literally said "doc + version bump". Judged the §4.2 deterministic-tooling-over-prose rule + §12's "orientation warn-on-pending" test to mandate a tested verb (matching the SLICE-2/3/4 family), not prose-only. Low risk; flagging the interpretation.
Next session prompt
The design-handoff flow is complete — there is no queued slice. The operator picks
the next item: close out #93 (drop the stale #98 dependency), pick up #102
once 0065's design graduates, or process plugin feedback. No /goal next slice is
parked.