9.8 KiB
Session 0034.0 — Transcript
App: ecomm Start: 2026-06-11T23-49 (PST) Type: planning-and-executing Claude-Session: 0cd3d94b-d0c3-4c5a-a802-19a2b48de7a4 Status: PLACEHOLDER — claimed at session start; finalized at session end.
This file reserves session ID 0034 for ecomm. The driver replaces this body with the full transcript and renames the file to its final SESSION-0034.0-TRANSCRIPT-2026-06-11T23-49--.md form at session end.
Launch prompt
/goal next → resumed the stored Next /goal: from memory:
Plan and build SLICE-7 of SD-0002 (products images pipeline end-to-end):
platform/objectstore port (local + GCS adapters), platform/images
(decode + resolution bar + WebP renditions), the post-commit in-process
image-fetch task with SSRF guard + bounds + restart recovery, the
app-served authorized image route with immutable caching, INV-12 extended
over images / hosted-URL recognition, run-detail images section +
Products-page notice band, TEL-4/5 + ALR-3. Hand the operator the flotilla
provision-bucket gesture for the per-env private GCS bucket at the PPE
deploy. DoD: PUC-7 acceptance, INV-12 over images, E2E e2e_image_outcomes
green, version 0.7.0 shipped through merge + PPE.
Plan
Anchor: design
wiggleverse-ecomm-content/specs/SD-0002-products-bulk-csv-import-export.md§7.2 SLICE-7 (R2a — graduated Solution Design, eligible) · issue wiggleverse/wiggleverse-ecomm#13 Posture: autonomous (yolo) Worktree:.claude/worktrees/slice-7-imageson branchworktree-slice-7-images(concurrent session 0027 in flight → §5.4 isolation)
Implementation plan written JIT (superpowers:writing-plans) →
docs/superpowers/plans/2026-06-11-slice-7-images.md (14 tasks, TDD,
cross-repo: ecomm + engineering launch-app provision-bucket). Archived to
the content repo plans/ at finalize. Executed subagent-driven this session.
Task list (DoD = SD-0002 §7.2 SLICE-7, PUC-7, INV-12/16/18, v0.7.0 PPE)
platform/images— decode + Q-3 bar (500px) + WebP renditionsplatform/objectstore— port + local/GCS adapters + config- hosted-image URL build/parse helpers (DB-free, host-agnostic)
- snapshot carries image
status; serializer emits hosted detail URL for fetched - diff resolves hosted URLs (INV-12 over images) + extended property test
- image-phase repo helpers + run progress/outcomes/counts payloads
- image-fetch phase — SSRF guard, INV-18 bounds, thread pool, resume
- confirm →
fetching_images; lifespan wiring + post-commit scheduling + recovery - app-served image route — storefront-authorized, immutable cache (INV-16)
- frontend — run-detail images section + poll, notice band, history column
- E2E
e2e_image_outcomes— fixture image host - engineering launch-app
provision-bucketgesture (cross-repo PR) - telemetry/docs/config glue + v0.7.0
- integration gate, merge, PPE deploy (operator: provision-bucket + ALR-3)
Progress (subagent-driven, TDD)
Tasks 1–11 DONE & verified (11 commits f27a243…0775537 on worktree-slice-7-images):
backend platform/images (Q-3 bar = 500px shorter side) + platform/objectstore
(local/GCS) + hosted URL helpers + snapshot status/hosted export + diff
hosted-URL resolution (INV-12 property test now mixes fetched images, 200 seeds
green) + image-phase repo helpers + the SSRF-guarded resumable fetch phase +
confirm→fetching_images & lifespan scheduler/recovery + the storefront-authorized
image-serving route; frontend run-detail images section (2s poll) + notice band +
history column. check.sh all gates green (lint-imports, 200 backend pytest,
frontend build, 19 vitest); e2e.sh 7/7 incl. e2e_image_outcomes.
Remaining: 12 (engineering provision-bucket), 13 (docs/config/v0.7.0), 14
(merge + PPE deploy, operator gestures).
Tasks 12–14 DONE (through merge)
- Task 12: launch-app
provision-bucketgesture built + merged — engineering PR #58 (merge8ca6507): idempotent per-env private media bucket provisioner (regional Standard, uniform access, public-access-prevention,import-drafts/1-day lifecycle, objectAdmin to the VM SA only; bucket name = non-secret overlay config; SPEC §6.6b). Default bucket<PROJECT>-ppe-media=wiggleverse-ecomm-ppe-media. - Task 13: docs (products-domain image pipeline + re-targeted draft-blob
seam; OPERATIONS provision-bucket gesture + TEL-4/5 + RB-3/ALR-3),
deployment.toml [overlay](ECOMM_OBJECTSTORE_KIND=gcs,ECOMM_OBJECTSTORE_BUCKET=wiggleverse-ecomm-ppe-media), v0.7.0 (VERSION + package.json + lockfile). - Final code review (whole-implementation): caught a Critical —
DecompressionBombError/unexpected processing or storage errors escapedprocess()/_process_one, abortingrun_image_phasebefore it set the run status → run strandedfetching_images→ recovery crash-loop (also a decomp-bomb DoS). Fixed (commitc929282):process()treats the bomb asrejected_not_image;_process_onewraps process+store in a per-image catch-all → marksfailedso one bad image never wedges the run; +2 regression tests. Honest-docs fix for theclaimsingle-worker assumption (review #2) and the resumable mid-fetch-restart behavior (review #3, accepted by §6.9 design). Minors #4–7 deferred (non-path / latent). Bootstrap-test extension skipped as redundant (round-trip-over-images already locked by the property test +e2e_roundtrip_noop/e2e_image_outcomes). - Task 14 (merge half DONE): final gates green —
check.sh(202 backend pytest, frontend build, 19 vitest) +e2e.sh7/7. Merged PR #30 (merge8ed9b25) →main; tagged v0.7.0 on the merge commit.
PPE DEPLOY — pending the operator provision-bucket gesture
The §9 pipeline's PPE stage is blocked on one operator-run provisioning gesture
(flotilla-only-provisioning, both postures). Runbook handed to the operator:
provision-bucket(launch-app skill) → createswiggleverse-ecomm-ppe-media, grants the VM SA objectAdmin, sets the lifecycle rule. Operator-run.CLOUDSDK_ACTIVE_CONFIG_NAME=wiggleverse-ecomm flotilla-core deploy ecomm(checks out thev0.7.0tag; may need a gcloud re-auth — prior-session gotcha).- ALR-3 gcloud log-based alert in project
wiggleverse-ecomm(mirror ALR-2). - PPE verify:
/healthz0.7.0; import a CSV with a public image URL → run-detail progresses to terminal; served…/images/{id}/detailloads; export→re-import all-unchanged. Stamprelease/<YYYY-MM-DDTHH-MM>(PST) on the deployed ref.
Final state (session end)
- SHIPPED to PPE. Operator ran
provision-bucket(bucketwiggleverse-ecomm-ppe-media, public-access-prevention enforced, VM SA objectAdmin, lifecycle rule). Session then deployed autonomously:flotilla-core deploy ecomm9/9 green (deploys.id=44, v0.7.0). PPE verified:/healthz0.7.0, image route + export 401-gated, sample.csv + SPA 200. ALR-3 provisioned (log metricecomm_image_phase_recovered+ policy + RB-3 doc, email channel). Tagsv0.7.0+release/2026-06-12T01-20pushed on the merge commit8ed9b25. - Plan archived →
wiggleverse-ecomm-content/plans/2026-06-11-slice-7-images.md. SD-0002 Q-3 resolved → D-15 (resolution bar shorter-side ≥500px) in the spec. - Deferred work parked → ecomm#31 (P3 task): draft-blob→objectstore, multi-worker claim, original content-type, allow-private deploy guard.
- Still pending (operator, manual): the authenticated PPE image walk — the
first real exercise of
GcsObjectStore(local/tests use LocalObjectStore). Sign in on PPE → import a CSV w/ a public image URL → run-detail reaches a terminal outcome → served rendition loads → export→re-import no-op. (Like SLICE-4's PUC-11 email rehearsal — needs the OTC email.)
Next /goal: Plan and build SLICE-8 of SD-0002 (Shopify dialect + public format
docs — completes PUC-6/PUC-11, closes Feature #13): header-set dialect detection
(codec.detect_dialect, INV-17), Shopify→canonical mapping + exhaustive fixture
table (§6.5.1), preview "mapped" banner + not-imported warnings, column-reference
doc + final sample CSV (DOC-2/3), E2E e2e_import_shopify_dialect, §12
traceability audit, v0.8.0 through merge + PPE — anchored on wiggleverse/wiggleverse-ecomm#13.
Deferred decisions
Autonomous-mode low-confidence calls the driver made and would have liked operator input on. Appended as the session runs; surfaced at finalize. Empty if none.
- Draft-blob storage left as BYTEA (deferred the objectstore move). The
products-domain.mdnamed seam "BYTEA draft blob → objectstore SLICE-7" is NOT in the §7.2 SLICE-7 Ships list (which is images-only). Moving the upload blob to the bucket adds risk to the working import/confirm path for the marginal benefit of the §6.3.1import-drafts/lifecycle safety net. Kept drafts as BYTEA (≤10 MB, 1 h expiry, swept); re-targeted the doc seam to a later hardening pass. The bucket gets only product-image objects this slice. - Image-fetch task implemented as a background thread + ThreadPoolExecutor
(not asyncio). The spec (§6.2/§6.7) describes "in-process asyncio task";
the rest of the stack is sync (sync psycopg pool, sync httpx). A
thread-based runner with an inner
ThreadPoolExecutor(max_workers≈4)over the run's pending images satisfies the binding invariants (in-process, post-commit, bounded concurrency ~4, resumable, per-image idempotent) and avoids an async/sync DB bridge. The §6.9 queue-portability seam is unaffected. - Q-3 resolution bar pinned: shorter side ≥ 500 px (configurable constant). Rejects icons/thumbnails while accepting normal product photos; consistent with the rendition ladder (detail ≤1600 / card ~480 / thumb ~160 are all downscale-only at ≥500). Recorded against SD-0002 §13 Q-3.