Files
session-history/ecomm/0013/SESSION-0013.0-TRANSCRIPT-2026-06-03T22-25--2026-06-03T23-48.md

5.9 KiB
Raw Permalink Blame History

Session 0013.0 — Transcript

App: ecomm Date: 2026-06-03 (start 22-25 PST · end 23-48 PST) Goal: build R07 products Outcome: R07 products shipped & merged to main (PR #2, 0716a78); two new OHM super-drafts minted in ohm-content; gate green (89 tests).

Launch prompt

build R07 products

Plan

Ship R07 products — the products feature, 37 scenarios (11.05.00010037), per ROADMAP.md. Wave-1 foundation, no upstream deps; the critical-path root that R11/R14/R15/R16/R17/R18/R19/R20/R22/R24/R34… depend on. Approach: new app/domains/products/ package mirroring locations; GraphQL + REST projections over one service behind require_section("products"); forward-only migration; one test per BDD scenario id; docs (SPEC §10, MAP, ROADMAP) updated in-change; scripts/check.sh green; push branch, operator merges.

Pre-session state

  • Session 0013 claimed at start (no other sessions in flight).
  • Repo clean, on main, level with origin/main. R01R03 shipped & merged (ecb7e95), main the only branch.
  • Org-context digest ~/.claude/wiggleverse.md is a dangling symlink (engineering/agent-context.md never authored; engineering repo on branch slice3-provision-vm-scaffold-gitea) — import left OUT of CLAUDE.md, flagged.
  • CI workflow ci.yml present but inert (no Gitea runner registered).

Turn-by-turn arc

  1. Session init. Claimed ID 0013 (peek → no in-flight → claim). Verified clean pushed-main baseline. Hit the dangling wiggleverse.md symlink — surfaced it, did not install a dead import. Memory resume pointer + ROADMAP both named R07 next.
  2. Brainstorming (design). Pulled the 37 products Gherkin scenarios from wiggleverse-ecomm-meta; read the locations/store domains, graphql/main wiring, db/units/importlinter/check.sh, SPEC. Surfaced the one real decision — the scope boundary for ~9 scenarios coupling to later-release nouns (collections R16, sales channels R20, storefront/redirects). Proposed option A (build core + storefront/ redirect seam, defer the two external nouns).
  3. Operator pivot → OHM first. Operator answered the scope question with "add any terms we need to the OHM before developing." Investigated ohm-content: found the corpus already covers products (Product & Listing, Price, Fulfillment & Inventory, Wise Speech, etc., all super-drafts), with two products-specific ethics unnamed: compare-at truthfulness and link-permanence. Surfaced the governance constraint (CONTRIBUTING.md: RFC contribution goes through the RFC app, not raw push). Operator chose: add both new terms, and authorized a one-off direct commit.
  4. Minted 2 OHM super-drafts. Authored reference-pricing.md (Reference Pricing) and addressability.md (Durable Addressability), landed each as a Propose:Merge proposal: pair, pushed ohm-content main (04afcd9..e24e82c). The Durable-Addressability choice confirmed scope option A (build 0018 + 0029).
  5. Spec + plan. Wrote the approved design spec and an 11-task TDD implementation plan under docs/superpowers/{specs,plans}/2026-06-03-r07-*, committed on a fresh r07-products branch.
  6. Implementation. Built the products domain (service + migration + __init__), added units.to_grams/to_mm, wired the full REST BFF and GraphQL surface, and wrote test_r07.py (one test per scenario + GraphQL parity + section-gate). One red on first run — a timezone bug in the date-range test (compared UTC-stored created_at to local today); fixed the test to anchor on UTC. Gate green: 89 tests.
  7. Docs + finish. SPEC §10 + §5 traceability + §6 deferrals (v0.6), MAP (mechanic-ID scheme generalized beyond 13.*), ROADMAP/README/health string. Pushed branch, opened PR #2 via the Gitea API helper (token never left the Keychain; first attempt posted garbage due to a shell-redirect/Python file-write collision — caught and redone). Operator approved → merged PR #2, synced main, deleted the branch.

Cut state (end of session)

Repo State Ref
wiggleverse-ecomm R07 merged to main; clean, level with origin; gate green (89 tests) 0716a78 (merge of PR #2)
↳ branch commits design c6de715, plan ec4e5d6, feat b64da2c, docs 538c669 (branch deleted post-merge)
ohm-content 2 new super-drafts on main, pushed e24e82c

Everything landed and pushed. No open PRs. No dirty tree.

What lands on the operator's plate

  • Nothing blocking. R07 is merged and green.
  • Unresolved infra (pre-existing, not R07): ~/.claude/wiggleverse.md is a dangling symlink → engineering/agent-context.md, which was never authored. The always-on org-context digest does not load; the import was deliberately kept out of this repo's CLAUDE.md. Resolve by authoring/merging that digest in the engineering repo.
  • Still open from before: no Gitea Actions runner registered, so ci.yml is inert; no branch protection on main.

Prompt the operator can paste into the next session

/goal Start the next wiggleverse-ecomm release. R07 products is merged (main @ 0716a78)
and is the catalog foundation. Read MEMORY.md + memory/project_ecomm_build.md for state
and ROADMAP.md for sequencing. Recommended next: finish a Wave-1 foundation (R04
content/files, R05 customers/customer-list, R06 online-store/preferences, or R08
settings/brand — all unblocked, no deps), OR take the now-unblocked Wave-2 keystone R15
orders (10.04.*). Build it the way R07 was: new app/domains/<name>/ package mirroring an
existing domain, GraphQL+REST over one service behind require_section, forward-only
migration, one test per BDD scenario id, SPEC/MAP/ROADMAP updated in-change,
scripts/check.sh green, push branch, operator merges. Cite OHM concepts from ohm-content;
if a mechanic needs a word not yet in the corpus, mint a super-draft first (as we did for
R07's reference-pricing + addressability).