# Session 0016.0 — Transcript > App: ecomm > Type: coding > Date: 2026-06-04 (PST) · Start 01-20 · End 05-14 > Goal: ship the next roadmap item (merged to `main`) > Outcome: **R05 merged + R06 `online-store/preferences` built and merged to `main`**; gate green at 189 tests. ## Plan `/wgl-coding-session-init` → operator: "Goal set: Next roadmap item", with the standing rule **a goal is not achieved until merged to `main`**. Baseline was on the unmerged `r05-customers-customer-list` branch (PR #4 open). Plan that emerged: 1. Merge R05/PR #4 to restore a clean `main` baseline. 2. Build **R06 `online-store/preferences`** (21 scenarios, `09.02.0001–0021`) end-to-end via the established cadence: design spec → TDD plan → execute → PR → merge. ## Pre-session state - On branch `r05-customers-customer-list`, clean + pushed, 2 commits ahead of `origin/main` — R05 built & green (151 tests) but **not merged** (PR #4 open). - Roadmap frontier: R01–R05 + R07 shipped; R06 `online-store/preferences` the next unshipped Wave-1 foundation. ## Turn-by-turn arc 1. **Session init (0016 claimed).** No other sessions in flight at claim time. Surveyed git: R05 unmerged on a feature branch. Surfaced the unclean baseline. 2. **Merged R05/PR #4** → `main` (`5fe20d9`) via the Gitea API; fast-forwarded local `main`, deleted the merged branch, ran the gate (151 green). Updated memory. 3. **R06 brainstorming.** Read the 21 BDD scenarios + the existing `customers`/`content` patterns. Surfaced the three load-bearing design decisions via `AskUserQuestion`; operator approved all as recommended: - new `online_store` domain (vs. extending `store`); - the unbuilt-dependency behaviours become **tested seams now** (R05 `set_customer_stats` pattern) rather than deferred scenarios; - favicon/social image **reuse the `content` files domain** for byte storage. 4. **Design spec** written + committed (`docs/superpowers/specs/2026-06-04-r06-*-design.md`, SPEC §13 lands at build time). Self-reviewed (fixed a GraphQL/REST favicon inconsistency). 5. **Implementation plan** written + committed (`docs/superpowers/plans/2026-06-04-r06-*.md`) — 8 TDD tasks, concrete code per step, self-reviewed for spec coverage / placeholders / type consistency. 6. **Executed** (inline, batched). New `online_store` domain + migration `0008`; ICO added to `content.ACCEPTED`; `online-store` staff section; REST + GraphQL wiring; one test per scenario + GraphQL parity + section gate (38 new tests). Gate green at **189 tests**, layering KEPT. 7. **Docs**: SPEC §13 + §6 seam-deferral note, MAP domain/lookup rows, ROADMAP R06 → ✅, health `release` string → `R04+R05+R06+R07`. 8. **Finished the branch**: pushed `r06-online-store-preferences`, opened Gitea **PR #5**, merged to `main` (`20ea29f`), fast-forwarded local `main`, deleted the branch. Gate green on `main`. 9. **Plugin upgrade** mid-session (0.8.0 → 0.10.0); finalized via the new unified `wgl-session-finalize`. ## Deferred decisions / low-confidence calls - **`setPasswordMessage` folded into `update_preferences`.** The design spec §6 listed a dedicated `setPasswordMessage` GraphQL mutation; in implementation the password-page message (09.02.0012) is just a non-sensitive field in the `update_preferences` PATCH, so a separate mutation was dropped as redundant. Behaviour and the scenario test are unchanged. Easy to add a dedicated mutation later if a UI wants it. (The three load-bearing design calls were operator-approved up front, not deferred.) ## Cut state (end of session) - `main` @ `20ea29f` — R01–R07 all merged. Gate green, **189 tests**. - Cross-repo: none — all R06 work is in `wiggleverse-ecomm`. - Commit trail (this session, on `main`): - `5fe20d9` merge PR #4 (R05) - `3660700` docs(R06) design spec · `0b89de0` docs(R06) plan - `d6e4f99` feat(R06) domain + GraphQL/REST + 21-scenario tests - `a864b14` docs(R06) SPEC §13 + MAP/ROADMAP/health - `20ea29f` merge PR #5 (R06) ## What lands on the operator's plate - **PR #6 `docs/retire-ecomm-prototype`** (by ben.stull, mergeable) is open and **not part of this session** — a separate docs effort (drops the retired prototype repo from app.json/README/SPEC; companion meta PR #1). The working tree is currently checked out on that branch. Operator chose to **leave it** for its own session — **do not disturb it.** - No other outstanding items; R06 is fully shipped. ## Prompt the operator can paste into the next session The next item is a fresh roadmap pick (no in-flight resume pointer — R06 is done). Wave-1 has three small foundations left (R08/R09/R10); the Wave-2 keystone R15 `orders` is also unblocked. Recommended next: ``` /goal Build R08 settings/brand (7 scenarios, 13.02.0001-0007), per wiggleverse-ecomm/ROADMAP.md — new foundation slice; alternatively R09 settings/plan, R10 settings/policies, or the Wave-2 keystone R15 orders (70 scenarios). First read memory project_ecomm_build.md. Note: PR #6 docs/retire-ecomm-prototype is a separate in-flight effort — leave it; start R08 from a clean main. ```