# Session 0077.0 — Transcript > App: dev-claude-plugin > Start: 2026-06-22T08-23 (PST) > End: 2026-06-22T08-37 (PST) > Type: planning-and-executing > Posture: yolo > Claude-Session: f4514902-147b-4807-bd13-c6fc2de3ca3f > Anchor: design `engineering/docs/sdl-pipeline-refactor-brief.md` (R2a) · Feature #126 · Epic #125 > Status: **FINALIZED** ## Launch prompt `/goal next → F2 (wgl-brainstorming --lenses brd|prd)` — resume the stored next goal: **F2** of the staged-gate SDLC refactor Epic. ## Plan **Goal (F2 / #126):** extend `wgl-brainstorming` so each design-track lens is an individually-gated, accreting stage selected by `--lenses brd|prd`. Tasks: 1. **`lenses-for-type.sh`** (new, `wgl-session-common/scripts/`) — deterministic §4.2 mapping issue-type → applicable lenses (feature → REQUIRED brd prd; leaf story/task/bug → SKIPPABLE; epic → NONE), `--type` (pure) + `--repo/--issue` (resolved) paths. Offline test `test-lenses-for-type.sh`. 2. **`wgl-brainstorming/SKILL.md`** — add the `--lenses brd|prd` parameter; BRD run authors the business lens, PRD run accretes the product lens (+ design-vs- code decision) into the SAME SPEC, each ending at a terminal review gate; lens applicability via the new script; cite F1's reconciled handbook; keep no-`--lenses` whole-spec behavior as the bridge until F3/F5. 3. **Version bump** 0.56.0 → 0.57.0. 4. **Lint** + branch → PR → merge. ## Session arc 1. **Routed** the `/goal next → F2` opener through the session gate → a planning-and-executing (coding) session; invoked `wgl-planning-and-executing`. 2. **Claimed session 0077** (peek showed 6 stale `--INPROGRESS` placeholders, 0035/0048/0058/0065/0068/0068/0076 — 9–13 days old, none live; already isolated in worktree `elastic-mccarthy-069d00`, so §5.4 satisfied). 3. **Oriented** on F2 from the locked brief (`engineering/docs/sdl-pipeline-refactor-brief.md`, design-track steps 1–2) and issue **#126** (full acceptance criteria fetched). 4. **Eligibility gate (Step 8.5):** #126 is `type/feature` → INELIGIBLE as a bare feature (R3); ELIGIBLE anchored on the locked brief (R2a). Anchored on the brief — rationale logged in Deferred decisions. 5. **Read F1's reconciled handbook** (§3.3 accretion + the lens→section table; §4.3 R1–R3 lens-by-type) so the skill prose CITES rather than restates (§4.1). 6. **Built `lenses-for-type.sh` TDD:** wrote `test-lenses-for-type.sh` (red, 0/14) → implemented the script → green (14/14). Modeled on `check-issue-eligibility.sh` / `test-issue-eligibility.sh` (stub gitea-api via fake `CLAUDE_PLUGIN_ROOT`). 7. **Edited `wgl-brainstorming/SKILL.md`:** new `## The --lenses brd|prd parameter` section (param, accretion-into-one-SPEC, terminal gate / no hand-off, type-applicability via the new script, Engineering lens = F3's wgl-tech-design, transitional no-`--lenses` default); Step 8.5 +point 5 (lens-applicability check); Step 9 points 3–4 made lens-scoped + terminal. Caught + fixed an inline-CLI-comment violation in a command block (`no-inline-cli-comments`). 8. **Version bump** 0.56.0 → 0.57.0. 9. **Verified:** new test 14/14; full `wgl-session-common` test sweep green (no regressions); `scripts/lint.sh --check-bump` clean (shellcheck skipped — not installed locally). 10. **Shipped:** committed (29326e3), pushed, opened PR **#130**, merged to main (bfa8efe), **#126 closed** via `Fixes #126`. 11. **Finalize:** made 0.57.0 live (`update-plugin.sh`, 0.56.0→0.57.0); updated memory (project + sdlc-refactor + index); tore down the worktree; published this transcript. ## Pipeline status (§9) `dev-claude-plugin` is a Claude Code plugin (skills + docs + hooks), **not** a flotilla-deployed UI app — it has no localhost/PPE/prod pipeline stage. Its "ship" equivalent is the version bump made live for the next session via `update-plugin.sh` (done, 0.57.0). No E2E/PPE stage to run. ## Deferred decisions - **Anchor = the locked Epic brief, not a per-Feature Solution Design.** #126 is `type/feature`, which R3 refuses for direct planning. Anchored instead on `engineering/docs/sdl-pipeline-refactor-brief.md` (ELIGIBLE R2a) because: the brief is the locked source-of-record carrying F2's full business/product/eng intent; this is a **bootstrap Epic** building the very per-Feature staged-design process that does not yet exist (it cannot be required to build itself); F1 shipped the same way. R3's purpose (a contract to judge the code against) is met by the brief + #126's acceptance criteria. Low-confidence-but-deliberate; would have liked a nod but proceeded under yolo. ## Next session **F3 — wgl-tech-design** (#127, Epic #125): a new gate-lifter session type authoring the SPEC **Engineering lens** (architecture/contract only — no task breakdown, which stays the plan's Tasks), accreting after brd/prd into the same SPEC, ending at its own gate → SPEC complete. Reuse F2's `lenses-for-type.sh`. Anchor on the locked brief (R2a; #127 is `type/feature`, bare-ineligible). ``` /goal F3 — wgl-tech-design (#127): new gate-lifter authoring the SPEC Engineering lens, accreting after brd/prd ``` ⚠️ Still outstanding (from session 0075): rotate the leaked `wgl-gitea-issues-readwrite-token` Keychain secret (§6.3).