# Session 0046.0 — Transcript > App: dev-claude-plugin > Start: 2026-06-10T00-37 (PST) > End: 2026-06-10T00-53 (PST) > Type: planning-and-executing > Status: **FINALIZED** ## Launch prompt ``` Fix three Gitea issues in one session, then close them after verification: - #58 Park deferred goals as Gitea issues, not the single memory slot (finalize seam) - #59 Escalate the feedback-notice on untriaged-count threshold / triage cadence - #27 Solution Designs displayed and reviewed one section at a time (brainstorming spec authoring) ``` ## Plan Fix three plugin-tracker issues, one branch/PR, isolated worktree off `origin/main` (0.29.0) because sessions 0035/0040–0045 were concurrently in flight. - **#59** — `hooks/feedback-notice`: escalate when untriaged ≥ configurable threshold (default 8) or triage stalled; distinct message; fail-open preserved. - **#58** — finalize seam: `finalize-core.md` Step 5b offers to park deferred goals as typed issues via `capture-issues.sh`, keeping `Next /goal:` for the immediate next step; memory = pointer + context, not the queue. - **#27** — `wgl-brainstorming` Step 9: author + review the Solution Design one section at a time (draft → rendered URL → discuss → approve → advance); never YOLO a whole spec. ## Pre-state - `origin/main` at `e4441f6` (0.30.0's predecessor 0.29.0); advanced to `795ebe1` (a concurrent brainstorming session's spec submit) before merge — no conflict. - Heavy concurrency: sessions 0035, 0040–0045 all `--INPROGRESS` at claim time. The shared checkout sat on `fix/capture-finalize-skip-memory` (another session's branch). - The three target issues were filed by the 0039 retrospective (#58/#59) and earlier (#27, P0 `triaged:accepted`). ## Session arc 1. **Gate + claim.** Classified the 3-issue fix as planning-and-executing; ran `wgl-planning-and-executing`; claimed session **0046** (peek showed 0035/0040–0045 in flight → autonomous default: warn + proceed). 2. **Isolated.** Created worktree `.claude/worktrees/session-0046` off `origin/main` (§5.4 — the shared checkout was another session's). Read all source for the three issues. 3. **#59 — feedback-notice escalation.** Added `WGL_FEEDBACK_UNTRIAGED_THRESHOLD` (default 8) + a cheap no-state-file cadence proxy `WGL_FEEDBACK_TRIAGE_MAX_AGE_DAYS` (default 14, oldest-untriaged age from `created_at`). Escalated `🚨 TRIAGE OVERDUE` message; bad-override→default sanitizer; fail-open preserved. **Verified:** live (24 untriaged → escalates), routine path (high threshold), invalid-env fallback, non-plugin silence, and synthetic cadence (30d issue → overdue; triaged excluded). 4. **#58 — parked-goals-as-issues.** Added `finalize-core.md` **Step 5b** (park deferred threads as typed issues via `capture-issues.sh`, resume context in body, right tracker via `--repo`/`--host`, operator-visible) + a Step 5 memory-role note + a Step 6 tie-in. Backfill check found the long-"PARKED" Patchwatch rfc-app thread is now `status:remediating` on #36–#40 (active, not parked — stale memory, exactly #58's point) and the plugin-side parked threads already filed as #55–#62 → no fabricated backfill issue. 5. **#27 — section-by-section spec authoring.** Added `wgl-brainstorming` **Step 9** (draft a section → commit/push to session branch → rendered Gitea `src/branch/…` URL → discuss/iterate → approve → advance), explicitly overriding the autonomous sprint for spec authoring; adjusted the "submitted at finalize" section for consistency. 6. **Ship.** Bumped `plugin.json` 0.29.0→**0.30.0**, updated the CLAUDE.md feedback-notice description, committed (`34a6e9c`), pushed, opened **PR #65**, merged (`29c358c`). Closed **#58/#59/#27** with resolution comments + `resolution:done` (Gitea had auto-closed only #59 from the PR keyword). 7. **Dogfood Step 5b.** Filed **#66** (P3 task) — mention section-by-section authoring in the canonical engineering `solution-design/GUIDE.md` — this session's one parked thread, filed via the new path instead of buried in memory. ## Cut state - **Shipped:** plugin **0.30.0** on `origin/main` (`29c358c`). PR #65 merged. - **Issues:** #58, #59, #27 closed `resolution:done`; #66 filed (follow-up). - Worktree clean, branch merged; transcript published. **Re-install needed** to make 0.30.0 live (the running session still loads the 0.28.1 cache). ## Deferred decisions - **#58 backfill — did NOT file a new "Patchwatch remediation depth" parked-goal issue.** On checking trackers: rfc-app Patchwatch #36–#40 are `status:remediating` (active, not parked — the memory "PARKED" note was stale, the exact failure #58 fixes); plugin-side parked threads already filed as #55–#62. Filing another would add stale noise. - **#27 scope — authoring protocol went in `wgl-brainstorming`, not the canonical `engineering/solution-design/GUIDE.md`.** The GUIDE owns document shape; the interactive review loop is session mechanics the skill owns. The engineering repo was also mid-work on a feature branch (collision risk). Parked the GUIDE follow-up as **#66** (dogfooding Step 5b). ## Operator plate - **Re-install 0.30.0** to make the new hook behavior / finalize Step 5b / brainstorming Step 9 live: `claude plugin marketplace update wiggleverse-dev-claude-plugin` then `claude plugin update wiggleverse-dev-claude-plugin@`, then restart/`/clear`. - **High-leverage next move:** `/goal feedback` — the ~25-untriaged pile is now loudly nudged by the very escalation shipped this session (the #59 catch-up triage pass). ## Next-session prompt ``` /goal feedback ``` (Triage the ~25 untriaged plugin-feedback issues — the catch-up pass from #59's decomposition, now escalated by the feedback-notice. The prior parked dev thread remains `/goal plan-and-execute #64`'s graduated design, untouched by this interrupt.)