From dfb7b10a61da4cc666315c22cba52e456e67b418 Mon Sep 17 00:00:00 2001 From: Ben Stull Date: Wed, 10 Jun 2026 00:54:32 -0700 Subject: [PATCH] update dev-claude-plugin/0046/SESSION-0046.0-TRANSCRIPT-2026-06-10T00-37--INPROGRESS.md --- ...TRANSCRIPT-2026-06-10T00-37--INPROGRESS.md | 100 ++++++++++++++++-- 1 file changed, 91 insertions(+), 9 deletions(-) diff --git a/dev-claude-plugin/0046/SESSION-0046.0-TRANSCRIPT-2026-06-10T00-37--INPROGRESS.md b/dev-claude-plugin/0046/SESSION-0046.0-TRANSCRIPT-2026-06-10T00-37--INPROGRESS.md index ae734dc..6d46e33 100644 --- a/dev-claude-plugin/0046/SESSION-0046.0-TRANSCRIPT-2026-06-10T00-37--INPROGRESS.md +++ b/dev-claude-plugin/0046/SESSION-0046.0-TRANSCRIPT-2026-06-10T00-37--INPROGRESS.md @@ -2,12 +2,9 @@ > App: dev-claude-plugin > Start: 2026-06-10T00-37 (PST) +> End: 2026-06-10T00-53 (PST) > Type: planning-and-executing -> Status: **PLACEHOLDER — claimed at session start; finalized at session end.** -> -> This file reserves session ID 0046 for dev-claude-plugin. The driver replaces this -> body with the full transcript and renames the file to its final -> SESSION-0046.0-TRANSCRIPT-2026-06-10T00-37--.md form at session end. +> Status: **FINALIZED** ## Launch prompt @@ -16,11 +13,96 @@ Fix three Gitea issues in one session, then close them after verification: - #58 Park deferred goals as Gitea issues, not the single memory slot (finalize seam) - #59 Escalate the feedback-notice on untriaged-count threshold / triage cadence - #27 Solution Designs displayed and reviewed one section at a time (brainstorming spec authoring) - ``` +## Plan + +Fix three plugin-tracker issues, one branch/PR, isolated worktree off `origin/main` +(0.29.0) because sessions 0035/0040–0045 were concurrently in flight. + +- **#59** — `hooks/feedback-notice`: escalate when untriaged ≥ configurable threshold + (default 8) or triage stalled; distinct message; fail-open preserved. +- **#58** — finalize seam: `finalize-core.md` Step 5b offers to park deferred goals as + typed issues via `capture-issues.sh`, keeping `Next /goal:` for the immediate next step; + memory = pointer + context, not the queue. +- **#27** — `wgl-brainstorming` Step 9: author + review the Solution Design one section at + a time (draft → rendered URL → discuss → approve → advance); never YOLO a whole spec. + +## Pre-state + +- `origin/main` at `e4441f6` (0.30.0's predecessor 0.29.0); advanced to `795ebe1` + (a concurrent brainstorming session's spec submit) before merge — no conflict. +- Heavy concurrency: sessions 0035, 0040–0045 all `--INPROGRESS` at claim time. The + shared checkout sat on `fix/capture-finalize-skip-memory` (another session's branch). +- The three target issues were filed by the 0039 retrospective (#58/#59) and earlier + (#27, P0 `triaged:accepted`). + +## Session arc + +1. **Gate + claim.** Classified the 3-issue fix as planning-and-executing; ran + `wgl-planning-and-executing`; claimed session **0046** (peek showed 0035/0040–0045 + in flight → autonomous default: warn + proceed). +2. **Isolated.** Created worktree `.claude/worktrees/session-0046` off `origin/main` + (§5.4 — the shared checkout was another session's). Read all source for the three + issues. +3. **#59 — feedback-notice escalation.** Added `WGL_FEEDBACK_UNTRIAGED_THRESHOLD` + (default 8) + a cheap no-state-file cadence proxy `WGL_FEEDBACK_TRIAGE_MAX_AGE_DAYS` + (default 14, oldest-untriaged age from `created_at`). Escalated `🚨 TRIAGE OVERDUE` + message; bad-override→default sanitizer; fail-open preserved. **Verified:** live + (24 untriaged → escalates), routine path (high threshold), invalid-env fallback, + non-plugin silence, and synthetic cadence (30d issue → overdue; triaged excluded). +4. **#58 — parked-goals-as-issues.** Added `finalize-core.md` **Step 5b** (park deferred + threads as typed issues via `capture-issues.sh`, resume context in body, right tracker + via `--repo`/`--host`, operator-visible) + a Step 5 memory-role note + a Step 6 tie-in. + Backfill check found the long-"PARKED" Patchwatch rfc-app thread is now + `status:remediating` on #36–#40 (active, not parked — stale memory, exactly #58's + point) and the plugin-side parked threads already filed as #55–#62 → no fabricated + backfill issue. +5. **#27 — section-by-section spec authoring.** Added `wgl-brainstorming` **Step 9** + (draft a section → commit/push to session branch → rendered Gitea `src/branch/…` URL → + discuss/iterate → approve → advance), explicitly overriding the autonomous sprint for + spec authoring; adjusted the "submitted at finalize" section for consistency. +6. **Ship.** Bumped `plugin.json` 0.29.0→**0.30.0**, updated the CLAUDE.md + feedback-notice description, committed (`34a6e9c`), pushed, opened **PR #65**, merged + (`29c358c`). Closed **#58/#59/#27** with resolution comments + `resolution:done` + (Gitea had auto-closed only #59 from the PR keyword). +7. **Dogfood Step 5b.** Filed **#66** (P3 task) — mention section-by-section authoring in + the canonical engineering `solution-design/GUIDE.md` — this session's one parked thread, + filed via the new path instead of buried in memory. + +## Cut state + +- **Shipped:** plugin **0.30.0** on `origin/main` (`29c358c`). PR #65 merged. +- **Issues:** #58, #59, #27 closed `resolution:done`; #66 filed (follow-up). +- Worktree clean, branch merged; transcript published. **Re-install needed** to make + 0.30.0 live (the running session still loads the 0.28.1 cache). + ## Deferred decisions -_Autonomous-mode low-confidence calls the driver made and would have -liked operator input on. Appended as the session runs; surfaced at -finalize. Empty if none._ +- **#58 backfill — did NOT file a new "Patchwatch remediation depth" parked-goal issue.** + On checking trackers: rfc-app Patchwatch #36–#40 are `status:remediating` (active, not + parked — the memory "PARKED" note was stale, the exact failure #58 fixes); plugin-side + parked threads already filed as #55–#62. Filing another would add stale noise. +- **#27 scope — authoring protocol went in `wgl-brainstorming`, not the canonical + `engineering/solution-design/GUIDE.md`.** The GUIDE owns document shape; the interactive + review loop is session mechanics the skill owns. The engineering repo was also mid-work + on a feature branch (collision risk). Parked the GUIDE follow-up as **#66** (dogfooding + Step 5b). + +## Operator plate + +- **Re-install 0.30.0** to make the new hook behavior / finalize Step 5b / brainstorming + Step 9 live: `claude plugin marketplace update wiggleverse-dev-claude-plugin` then + `claude plugin update wiggleverse-dev-claude-plugin@`, then restart/`/clear`. +- **High-leverage next move:** `/goal feedback` — the ~25-untriaged pile is now loudly + nudged by the very escalation shipped this session (the #59 catch-up triage pass). + +## Next-session prompt + +``` +/goal feedback +``` + +(Triage the ~25 untriaged plugin-feedback issues — the catch-up pass from #59's +decomposition, now escalated by the feedback-notice. The prior parked dev thread +remains `/goal plan-and-execute #64`'s graduated design, untouched by this interrupt.)