update ecomm/0034/SESSION-0034.0-TRANSCRIPT-2026-06-11T23-49--INPROGRESS.md
This commit is contained in:
@@ -66,6 +66,48 @@ frontend build, 19 vitest); **`e2e.sh` 7/7** incl. `e2e_image_outcomes`.
|
|||||||
Remaining: 12 (engineering `provision-bucket`), 13 (docs/config/v0.7.0), 14
|
Remaining: 12 (engineering `provision-bucket`), 13 (docs/config/v0.7.0), 14
|
||||||
(merge + PPE deploy, operator gestures).
|
(merge + PPE deploy, operator gestures).
|
||||||
|
|
||||||
|
### Tasks 12–14 DONE (through merge)
|
||||||
|
|
||||||
|
- **Task 12**: launch-app `provision-bucket` gesture built + merged — engineering
|
||||||
|
**PR #58** (merge `8ca6507`): idempotent per-env private media bucket
|
||||||
|
provisioner (regional Standard, uniform access, public-access-prevention,
|
||||||
|
`import-drafts/` 1-day lifecycle, objectAdmin to the VM SA only; bucket name =
|
||||||
|
non-secret overlay config; SPEC §6.6b). Default bucket `<PROJECT>-ppe-media` =
|
||||||
|
`wiggleverse-ecomm-ppe-media`.
|
||||||
|
- **Task 13**: docs (products-domain image pipeline + re-targeted draft-blob
|
||||||
|
seam; OPERATIONS provision-bucket gesture + TEL-4/5 + RB-3/ALR-3),
|
||||||
|
`deployment.toml [overlay]` (`ECOMM_OBJECTSTORE_KIND=gcs`,
|
||||||
|
`ECOMM_OBJECTSTORE_BUCKET=wiggleverse-ecomm-ppe-media`), **v0.7.0** (VERSION +
|
||||||
|
package.json + lockfile).
|
||||||
|
- **Final code review** (whole-implementation): caught a **Critical** —
|
||||||
|
`DecompressionBombError`/unexpected processing or storage errors escaped
|
||||||
|
`process()`/`_process_one`, aborting `run_image_phase` before it set the run
|
||||||
|
status → run stranded `fetching_images` → recovery crash-loop (also a
|
||||||
|
decomp-bomb DoS). **Fixed** (commit `c929282`): `process()` treats the bomb as
|
||||||
|
`rejected_not_image`; `_process_one` wraps process+store in a per-image
|
||||||
|
catch-all → marks `failed` so one bad image never wedges the run; +2 regression
|
||||||
|
tests. Honest-docs fix for the `claim` single-worker assumption (review #2) and
|
||||||
|
the resumable mid-fetch-restart behavior (review #3, accepted by §6.9 design).
|
||||||
|
Minors #4–7 deferred (non-path / latent). Bootstrap-test extension skipped as
|
||||||
|
redundant (round-trip-over-images already locked by the property test +
|
||||||
|
`e2e_roundtrip_noop`/`e2e_image_outcomes`).
|
||||||
|
- **Task 14 (merge half DONE)**: final gates green — `check.sh` (202 backend
|
||||||
|
pytest, frontend build, 19 vitest) + `e2e.sh` **7/7**. Merged **PR #30** (merge
|
||||||
|
`8ed9b25`) → `main`; tagged **v0.7.0** on the merge commit.
|
||||||
|
|
||||||
|
### PPE DEPLOY — pending the operator `provision-bucket` gesture
|
||||||
|
|
||||||
|
The §9 pipeline's PPE stage is blocked on one operator-run provisioning gesture
|
||||||
|
(`flotilla-only-provisioning`, both postures). Runbook handed to the operator:
|
||||||
|
1. `provision-bucket` (launch-app skill) → creates `wiggleverse-ecomm-ppe-media`,
|
||||||
|
grants the VM SA objectAdmin, sets the lifecycle rule. **Operator-run.**
|
||||||
|
2. `CLOUDSDK_ACTIVE_CONFIG_NAME=wiggleverse-ecomm flotilla-core deploy ecomm`
|
||||||
|
(checks out the `v0.7.0` tag; may need a gcloud re-auth — prior-session gotcha).
|
||||||
|
3. ALR-3 gcloud log-based alert in project `wiggleverse-ecomm` (mirror ALR-2).
|
||||||
|
4. PPE verify: `/healthz` 0.7.0; import a CSV with a public image URL → run-detail
|
||||||
|
progresses to terminal; served `…/images/{id}/detail` loads; export→re-import
|
||||||
|
all-unchanged. Stamp `release/<YYYY-MM-DDTHH-MM>` (PST) on the deployed ref.
|
||||||
|
|
||||||
## Deferred decisions
|
## Deferred decisions
|
||||||
|
|
||||||
_Autonomous-mode low-confidence calls the driver made and would have
|
_Autonomous-mode low-confidence calls the driver made and would have
|
||||||
|
|||||||
Reference in New Issue
Block a user