diff --git a/dev-claude-plugin/0078/SESSION-0078.0-TRANSCRIPT-2026-06-22T08-42--2026-06-22T08-54.md b/dev-claude-plugin/0078/SESSION-0078.0-TRANSCRIPT-2026-06-22T08-42--2026-06-22T08-54.md new file mode 100644 index 0000000..22db230 --- /dev/null +++ b/dev-claude-plugin/0078/SESSION-0078.0-TRANSCRIPT-2026-06-22T08-42--2026-06-22T08-54.md @@ -0,0 +1,65 @@ +# Session 0078.0 — Transcript + +> App: dev-claude-plugin +> Start: 2026-06-22T08-42 (PST) +> End: 2026-06-22T08-54 (PST) +> Type: planning-and-executing +> Posture: yolo +> Claude-Session: 037a56a3-91e5-4e08-8023-095c65246353 +> Status: **FINALIZED** + +## Launch prompt + +``` +/goal F3 — wgl-tech-design (#127): new gate-lifter skill authoring the SPEC Engineering lens, accreting after brd/prd. +Part of the staged-gate SDLC refactor (Epic #125). F1 (handbook accretion) and F2 (wgl-brainstorming --lenses brd|prd) shipped. F3 adds the Engineering-lens gate-lifter that accretes the engineering lens into the SAME SPEC after the business/product lenses. +``` + +## Plan + +> Anchor: design `engineering/docs/sdl-pipeline-refactor-brief.md` (R2a, locked Solution Design) — Feature **#127** (parent Epic **#125**). Eligibility: ELIGIBLE (R2a). +> Goal: F3 of the staged-gate SDLC refactor — build **`wgl-tech-design`**, a new gate-lifter session type that authors the SPEC **Engineering lens** (Technical Design §6) by accretion into the *same* SPEC the brd/prd lenses created, at the architecture/contract altitude (**NO task breakdown** — that's F4), ending at a terminal review gate. + +**Scope boundary (per #127):** +- **In F3:** the `wgl-tech-design` skill; make the type claimable + posture-stamped (`claim-session-id.sh` type→posture single-home → `tech-design` = careful) + its test; thin-SPEC path for leaf issues; cites reconciled handbook (F1), reuses existing deterministic tools. +- **Deferred to F5 (#129):** registering `tech-design` in the session-gate hook type table + the wgl-session-finalize dispatch table + stale-ref sweep. (Finalize Step-0 fallback covers the transitional gap.) + +## Pre-state + +- Branch `claude/pedantic-carson-35d379` (harness-provided worktree) tracking a clean, pushed `origin/main` at `bfa8efe` (F2 / v0.57.0 merge). +- Plugin pin loaded by this session: **0.57.0**. +- Six stale `--INPROGRESS` placeholders (0035–0076, 9+ days old) in the app's session-history — orphaned crashes, none flagged ENDED-UNFINALIZED, none live. No live concurrent same-app session. + +## Arc + +1. **Classified + opened the session.** Session gate → planning-and-executing (build a skill, plan→code). Invoked `wgl-planning-and-executing`. +2. **Claimed session 0078** (peek → no live concurrency → atomic claim). Stamped `Type: planning-and-executing`, `Posture: yolo`. Local placeholder in `~/.wgl`. +3. **Verified baseline** clean/pushed; CLAUDE.md already imports `@~/.claude/wiggleverse.md`. +4. **Studied the F2 pattern + the locked brief.** Read `engineering/docs/sdl-pipeline-refactor-brief.md` (design-track step 4 — wgl-tech-design authors the engineering lens, no task breakdown; two altitudes stay distinct), the shipped `wgl-brainstorming/SKILL.md` (`--lenses brd|prd` accretion model), `lenses-for-type.sh`, and issue **#127** (in-scope vs F5 non-goals). Confirmed via `solution-design/GUIDE.md` that the **engineering lens = Technical Design §6**, and completes the SPEC. +5. **Eligibility (Step 8.5):** `check-issue-eligibility.sh --design --for implementation-plan` → ELIGIBLE (R2a, locked Solution Design). #127 itself is a bare `type/feature` (R3-ineligible) — anchored on the brief instead. +6. **Built F3** (4 tasks): + - `claim-session-id.sh`: added `tech-design` to `--type` validation + error msg + the type→posture single-home (→ **careful**, design INV-1). Header doc updated. + - `test-posture-stamp.sh`: added `tech-design → careful` assertion. → **11/11 pass**. + - `skills/wgl-tech-design/SKILL.md`: the new gate-lifter — front-half reuse (claim/baseline/memory Steps 1–7), engineering-lens accretion into the existing SPEC, **thin-SPEC path** for a leaf that skipped brd/prd, careful-by-construction + terminal gate, the load-bearing **architecture/contract-only (no task breakdown)** boundary, eligibility reuse (`--for solution-design` R1; `lenses-for-type.sh` R1–R3), finalize participation (spec addendum) + a bootstrap note on F5 wiring. Cites handbook §3.3/§4.3 + GUIDE rather than restating (§4.1). + - `plugin.json`: 0.57.0 → **0.58.0**. +7. **Verified:** `test-posture-stamp.sh` 11/11 · `test-session-id-ownership.sh` 20/20 · `test-lenses-for-type.sh` 14/14 · `test-issue-eligibility.sh` 14/14 · `lint.sh --check-bump` clean (shellcheck skipped — not installed; later confirmed `0.57.0 → 0.58.0 with skills changes`). +8. **Shipped:** committed `869ce50`, pushed, opened **PR #131** (Gitea API; the issues token 403'd on PR scope → used the default per-host `wgl-gitea-token-git.wiggleverse.org`), merged to `main` (`72a2576`). **#127 closed** (PR body `Closes #127`). +9. **Finalize:** clean tree, no open PRs. No separate writing-plans artifact (plan was inline) → nothing to `submit-plan.sh`. Meta/plugin change → no PPE pipeline stage. **Cache-lag:** loaded 0.57.0 < shipped 0.58.0 → ran `update-plugin.sh` → **0.57.0 → 0.58.0 made live** (applies to new sessions; restart/`/clear` to load). Memory updated; transcript published. + +## Cut state + +- `origin/main` @ `72a2576` — F3 merged, **v0.58.0** shipped and made live. +- `wgl-tech-design` skill exists and is invocable (lifts the gate when invoked directly). `tech-design` is a claimable session type stamping careful posture. +- **#127 closed.** Epic #125: F1✓ F2✓ F3✓ — **F4 (#128) next**, then F5 (#129). +- Worktree `pedantic-carson-35d379` left for harness cleanup (branch merged/clean). + +## Deferred decisions + +- **F3/F5 boundary on finalize dispatch.** #127's scope lists "finalize participation" as in-scope but "finalize dispatch table" as an F5 non-goal — a genuine tension. **Resolved:** F3 makes the type claimable + posture-stamped and the skill *describes* its finalize participation; the actual `case` registration in `wgl-session-finalize` (and the session-gate classifier table) is left to F5. Until then, finalize's Step-0 fallback routes a `tech-design` SPEC to the spec addendum. Low-confidence call logged here for review; the gap is benign during the bootstrap (the new types aren't yet driven by the pipeline gate). +- **Engineering lens NOT added to `lenses-for-type.sh`.** That script is deliberately the brainstorming `{brd, prd}` pair; the engineering lens applicability is handled by reusing `check-issue-eligibility.sh --for solution-design` (R1) + reading the brd/prd verdict for the feature-vs-leaf path. No new deterministic tool invented (§4.2). + +## Next-session prompt + +``` +/goal F4 — split wgl-planning-and-executing into wgl-writing-plans + wgl-executing-plans (#128, Epic #125): one plan = one execution; the SPEC's native Task→Step structure IS the decomposition (no per-slice loop); thin wrappers at native superpowers grain. Anchor on the locked brief (R2a). Then F5 (#129) wires the gate/finalize tables for the F3+F4 types + stale-ref sweep. +``` diff --git a/dev-claude-plugin/0078/SESSION-0078.0-TRANSCRIPT-2026-06-22T08-42--INPROGRESS.md b/dev-claude-plugin/0078/SESSION-0078.0-TRANSCRIPT-2026-06-22T08-42--INPROGRESS.md deleted file mode 100644 index 39253de..0000000 --- a/dev-claude-plugin/0078/SESSION-0078.0-TRANSCRIPT-2026-06-22T08-42--INPROGRESS.md +++ /dev/null @@ -1,26 +0,0 @@ -# Session 0078.0 — Transcript - -> App: dev-claude-plugin -> Start: 2026-06-22T08-42 (PST) -> Type: planning-and-executing -> Posture: yolo -> Claude-Session: 037a56a3-91e5-4e08-8023-095c65246353 -> Status: **PLACEHOLDER — claimed at session start; finalized at session end.** -> -> This file reserves session ID 0078 for dev-claude-plugin. The driver replaces this -> body with the full transcript and renames the file to its final -> SESSION-0078.0-TRANSCRIPT-2026-06-22T08-42--.md form at session end. - -## Launch prompt - -``` -/goal F3 — wgl-tech-design (#127): new gate-lifter skill authoring the SPEC Engineering lens, accreting after brd/prd. -Part of the staged-gate SDLC refactor (Epic #125). F1 (handbook accretion) and F2 (wgl-brainstorming --lenses brd|prd) shipped. F3 adds the Engineering-lens gate-lifter that accretes the engineering lens into the SAME SPEC after the business/product lenses. - -``` - -## Deferred decisions - -_Autonomous-mode low-confidence calls the driver made and would have -liked operator input on. Appended as the session runs; surfaced at -finalize. Empty if none._